Skip to main content

Israeli contractor using Hitachi excavator for road construction

In Israel a specialist contractor is using a new Hitachi excavator for major earthmoving work on the Road 65 construction project in the north of the country. Hilkiyahu’s ZX670LCH-5 has already clocked over 1,100 working hours, excavating and loading 1.5million m³ of materials on the upgraded route.
December 4, 2014 Read time: 2 mins
Israeli contractor is making use of Hitachi excavators for use in road building and quarrying

In Israel a specialist contractor is using a new Hitachi excavator for major earthmoving work on the Road 65 construction project in the north of the country. Hilkiyahu’s ZX670LCH-5 has already clocked over 1,100 working hours, excavating and loading 1.5million m³ of materials on the upgraded route.

The company took delivery of the large Zaxis-5 machine from the 233 Hitachi dealer in Israel, CMD, in December 2013. The machine was supplied with a 4.2m³ rock bucket and two-year/6,000-hour extended warranty to join Hilkiyahu’s expanding fleet of seven excavators.

Road 65 is a major highway that connects the Hadera (central) and Galilee (northern) regions via the shortest and easiest route. The current project is to widen the road between the Golani and new Nahal Amud interchanges. A second carriageway is being added, which will provide for two lanes in each direction, along with eight new junctions and a bridge. The earthmoving work between Masad and the Nahal Amud junction began in November 2013 and the whole project is scheduled for completion within the next two years.

The firm is working as a sub-contractor on the third section of the new road, which is 13km long. Its job is to complete all of the earthmoving, drainage, blasting and breaking of the rocks, and add the base layers to the road, before another contractor lays the asphalt. In addition the firm is operating a ZX470LCH-3 in a nearby quarry, which is supplying aggregates for the road.

For more information on companies in this article

Related Content

  • Cost increases for major Chilean highway project
    November 15, 2013
    The cost of Chile’s Vespucio Oriente highway project is increasing, while its completion also looks set to be delayed. A 13% budget increase is now required due to additional costs from a number of factors such as urban landscaping, according to Business News Americas. The Américo Vespucio Oriente (AVO) expressway is being built in Chilean capital Santiago and was originally expected to cost in the region of US$940 million. However Chile’s Public Works Ministry, MOP, has said that the route will now cost so
  • Hitachi Zaxis 5 wheeled excavators deliver performance
    January 6, 2017
    Hitachi Construction Machinery is showing four models from its Zaxis 5 range of wheeled excavators. The ZX140W-5, ZX170W-5, ZX190W-5 and ZX220W-5 all feature Isuzu Stage IIIB emissions-compliant engines powering the HIOS III hydraulic system. They benefit from increased lifting capacities, as the power boost function has been increased by 11%. The machines have a revised ROPS cab that has been redesigned to improve visibility. A new monitor sits on the right-hand pillar with a rear-view camera providing vis
  • Hitachi Zaxis 5 wheeled excavators deliver performance
    April 16, 2013
    Hitachi Construction Machinery is showing four models from its Zaxis 5 range of wheeled excavators. The ZX140W-5, ZX170W-5, ZX190W-5 and ZX220W-5 all feature Isuzu Stage IIIB emissions-compliant engines powering the HIOS III hydraulic system. They benefit from increased lifting capacities, as the power boost function has been increased by 11%. The machines have a revised ROPS cab that has been redesigned to improve visibility. A new monitor sits on the right-hand pillar with a rear-view camera providing vis
  • Key SR-91 highway upgrade underway in California
    December 16, 2013
    In the US state of California, construction is now underway for the State Route 91 (SR-91) Corridor Improvement Project. This improved section for SR-91 will run through the Corona and Riverside, both of which are located in Riverside County. The project will extend the SR-91 Tolled Express Lanes in Orange County into Riverside County, a distance of 17.6km. This includes a 13km stretch into Riverside County on SR-91, with a 5km flyover connecting to Interstate 15 from SR-91. Riverside County Transportation