Skip to main content

Tunnel for Montreal?

A new tunnel project to connect Montreal with St Lambert has been proposed by a Canadian entrepreneur. The tunnel would run under the St Lawrence Seaway and was proposed by property magnate Luc Poirier as a possible solution to traffic congestion.
April 25, 2012 Read time: 1 min
A new tunnel project to connect Montreal with St Lambert has been proposed by a Canadian entrepreneur. The tunnel would run under the St Lawrence Seaway and was proposed by property magnate Luc Poirier as a possible solution to traffic congestion. Two investment funds in Quebec Province have expressed interest in the private toll tunnel project, although Poirier has said that he could fund the construction work by himself. The Montreal authorities have yet to consider the proposals. Meanwhile 1521 Quebec's Ministry of Transport has revealed plans to extend the Laurentienne highway between boulevard Wilfrid-Hamel and the Félix-Leclerc highway. It has not so far been specified whether one new lane will be added or whether new lanes will be added in both directions however. The Laurentienne highway currently features six lanes along most of the route but only four between boulevard Wilfrid-Hamel and the Félix-Leclerc highway.

For more information on companies in this article

Related Content

  • Middle East financing for Moscow’s new toll route
    June 12, 2018
    Financing from the Middle East is helping to build the first toll road in Russia’s capital Moscow – Eugene Gerden reports. The first toll road within the Russian capital Moscow will be built this year with financing from a consortium comprising Russian and Arabian investors. This was revealed officially in a recent statement from the Moscow City Government. The heart of the project involves building a relief road for Kutuzovsky Prospekt, a major radial avenue in Moscow, which is known for its luxury stores
  • Canada: work officially starts on Montreal’s Champlain Bridge
    June 25, 2015
    Canada’s infrastructure minister, Denis Label, officially broke ground for Montreal’s replacement Champlain Bridge, saying the project will likely cost US$3.42 billion. The 3.4km Champlain Bridge Corridor Project, including spans and highway expansions, is expected to be completed by 2019. SNC-Lavalin, the 50% stakeholder in the winning consortium Signature on the Saint-Lawrence, recently announced it had finalised the deal with new Champlain Bridge owner Infrastructure Canada. Signature on the Saint-
  • Stonehenge Tunnel project faces further questions
    May 22, 2019
    Plans to construct a tunnel link for the A303 route past the famous Stonehenge monument have hit further problems.
  • Montreal’s new Champlain Bridge is in a race against time
    June 8, 2018
    Montreal’s US$3.24 billion Champlain Bridge across the St Lawrence River may not be open on time, according to a report by the independent Auditor General. The 3.4km cable-stayed bridge has two decks supporting three lanes of highway traffic in each direction. A third, central deck supports a mass transit system and a multi-use path. The new bridge will replace the nearby 50-year-old Champlain Bridge which has been deteriorating at an alarming rate. The government signed a contract in 2015 with a private