Skip to main content

Poland: €7.57bn road budget call

The Polish highway authorities are calling for a road budget of e7.57 billion for 2011, and while this will have to be approved by the government, it is some e1.56 billion lower than originally planned.
February 20, 2012 Read time: 2 mins
The Polish highway authorities are calling for a road budget of €7.57 billion for 2011, and while this will have to be approved by the government, it is some e1.56 billion lower than originally planned.

Of the total, €754.5 million would be allocated for the maintenance of roads and the General Directorate for National Roads and Motorways (1361 GDDKiA), slightly more than the €681.3 million planned earlier.

Meanwhile, a settlement has been reached between the Polish authorities and Austrian contractor 2859 Alpine regarding an 18km section of the A1 highway. The €139 million deal is for a section of the highway in Silesia in the south of the country and includes work on 32 bridges.

The project has some history as Alpine was previously awarded the contract but then it lost it in 2009 following a series of disagreements over the schedule as well as the construction of a bridge.

In a separate deal with a different contractor, work is to go ahead on a stretch of the A2 highway between Pruszkow and the junction serving Konopta, a 7.1km section of highway that will cost €107.33 million. Work includes erecting two junctions, as well as bridges, lighting and acoustic and anti-vibration screens. The A2 highway runs west to east across Poland through the central belt of the country, connecting Poland with neighbouring Germany and Belarus.

A deal has also been struck for EU funding for a €82.5 million bridge project over the Vistula River in Poland, which is to be built by a consortium comprising 945 Strabag and 2861 Hermann Kirchner Polska.

For more information on companies in this article

Related Content

  • Strabag wins Poland S7 dual carriageway tender
    June 17, 2014
    Strabag consortium has won a tender for the construction of a 4.5km S7 dual carriageway section in the eastern part of Krakow, Poland. The investment will also include the construction of a bridge over the Vistula River. The gross value of the offer made by Strabag reached almost €127.93 million (PLN 529 million), which is less than the budget of the investor set at PLN 610.3 million. In total nine offers have been submitted in the tender. All bidders offered a ten-year guarantee and a 27-month deadline.
  • Despite earlier contractor issues, road projects in Bosnia are proceeding on track
    May 16, 2012
    Key road construction projects are now moving forward in Bosnia with work on-track for the Sarajevo ringroad as well as the Corridor Vc highway. Construction of a 130km section of the Corridor Vc highway should be complete by 2014 according to Bosnia's Ministry of Transport and Telecoms. Work on the first section of the Sarajevo ringroad should be completed within five months, following the signing of an agreement worth €17 million between the Austrian firm Strabag and the Bosnian company HP Investing. The
  • New Polish road projects planned
    March 19, 2021
    New Polish road projects are now being planned.
  • Preparations for Polish project – widening work
    December 13, 2018
    Widening work for Poland’s A2 highway will be carried out between the Lodz Polnoc Junction and Konotopa Junction. The 88km highway stretch will benefit from the addition of an extra lane in either direction. Between Polnoc and Pruszkow this will result in a third lane being added in either direction. Between Pruszkow and Konotopa meanwhile this will result in a fourth lane being added in either direction. The construction work will take until 2021 to complete and will cost around €139.22 million. The Polish