Skip to main content

Strabag wins Poland S7 dual carriageway tender

Strabag consortium has won a tender for the construction of a 4.5km S7 dual carriageway section in the eastern part of Krakow, Poland. The investment will also include the construction of a bridge over the Vistula River. The gross value of the offer made by Strabag reached almost €127.93 million (PLN 529 million), which is less than the budget of the investor set at PLN 610.3 million. In total nine offers have been submitted in the tender. All bidders offered a ten-year guarantee and a 27-month deadline.
June 17, 2014 Read time: 1 min
945 Strabag consortium has won a tender for the construction of a 4.5km S7 dual carriageway section in the eastern part of Krakow, Poland. The investment will also include the construction of a bridge over the Vistula River. The gross value of the offer made by Strabag reached almost €127.93 million (PLN 529 million), which is less than the budget of the investor set at PLN 610.3 million. In total nine offers have been submitted in the tender. All bidders offered a ten-year guarantee and a 27-month deadline.

For more information on companies in this article

Related Content

  • Astaldi begins drilling tunnels on Poland’s S7 dual carriageway
    March 14, 2017
    Italian contractor Astaldi has begun drilling two parallel tunnels as part of its S7 dual carriageway project in Poland. Each tunnel, between Naprawa and Skomielna Biala and under the Lubon Maly massif, will each be just over 2km long. Astaldi, based in Rome, won the three-year S7 dual carriageway project worth around €225 million in 2016 Work includes 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when complete
  • Astaldi wins Polish S7 contract between Naprawa and Skomielna Biala
    March 3, 2016
    Astaldi, a global construction company based in Rome, has won a contract worth nearly €222 million for construction of Poland’s S7 dual carriageway between Naprawa and Skomielna Biala. The contract, awarded by the Polish General Directorate for National Roads and Motorways (GDDKiA), includes construction of a 2km tunnel under the Lubon Maly massif, 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when completed, will ru
  • Strabag leads consortium for planned Polish project
    July 24, 2014
    Austrian contractor Strabag will lead the consortium constructing a stretch of the S7 expressway in Poland. Strabag is teaming up with Heilit+Woerner for the project to build the Trasa Nowohucka section of the S7 linking Rybitwy and Igołomska and lying to the east of Kraków. Construction work is commencing in August/September 2014 and the contract is worth around €130 million. The consortium is handling the upgrading and construction work for some 18.6km of roads in all. The work includes widening a 4.5km l
  • STRABAG wins tricky Polish project
    March 21, 2012
    Austrian construction firm STRABAG has won a major road contract from Poland’s General Directorate for National Roads and Highways (GDDKiA). The deal is for the construction of a 40km section of the S8 Expressway between Walichnowy and Sieradz Poùudnie, some 240km to the south west of capital Warsaw.