Skip to main content

No Vienna-Prague link in Austria-Czech road agreement

A direct motorway between Austria’s capital, Vienna, and the Czech Republic capital, Prague, is not part of a new agreement on road connections between the two nations. The agreement formed by Austrian and Czech transport ministers Erwin Pröll and Antonin Prachar states that a four-lane A5 motorway will only go as far as Poysbrunn on the Austrian side, and will then continue with two lanes towards the Czech border. The overall road link is due to be completed in 2017.
October 2, 2014 Read time: 1 min
A direct motorway between Austria’s capital, Vienna, and the Czech Republic capital, Prague, is not part of a new agreement on road connections between the two nations. The agreement formed by Austrian and Czech transport ministers Erwin Pröll and Antonin Prachar states that a four-lane A5 motorway will only go as far as Poysbrunn on the Austrian side, and will then continue with two lanes towards the Czech border. The overall road link is due to be completed in 2017.

Related Content

  • Vienna tests car ban on Mariahilfer Strasse shopping route
    August 20, 2013
    Austria’s capital Vienna is carrying out a test which will ban cars on part of the Mariahilfer Strasse, the country's biggest shopping street. The test ban will also make it impossible for drivers to cross the road or to stop. Lasting for several months and if deemed a success, the test ban could lead to a permanent car ban coupled with pedestrian-friendly construction works from 2014. Critics of the car test ban fear it will drive many shoppers to out of town shopping centres.
  • Chinese firms to work on Serbia’s Corridor 11 project
    November 30, 2015
    Serbia and China have signed a memorandum of understanding for construction of two sections of Serbia’s Corridor 11. The MoU was inked in during Serbian Prime Minister Aleksandar Vucic’s visit to the Chinese capital Beijing last week. Serbia’s Tanjug news agency reported that Vucic said the deal was worth around €209 million and included construction of the 18km Surcin-Obrenovac bridge. Corridor 11 runs from the Serbian capital Belgrade southwest to the border with Montenegro, another member state of
  • Tunnels eliminate bottlenecks
    February 10, 2012
    Some of the bottlenecks on the multi-lane Mittlere Ring, Munich, Germany, one of the main arterial roads circling the city centre have been eliminated by the addition of new tunnels. The Luise-Kiesselbach Square, the last section of this road improvement effort, is an important traffic hub south-west of the city where motorways A96 from Lindau and A5 from Garmisch meet, causing long delays in daily rush-hour traffic, writes Patrick Smith.
  • Prague tunnel construction complete
    May 10, 2012
    Drilling work on the Blanka road tunnel in Czech capital Prague has now been completed. The new tunnel will become part of the Prague ring road once it is open to traffic. Construction commenced in 2007 but the project has faced a series of problems, including three collapses. The original cost was estimated at nearly €870 million for the construction works, €172 million for technology and €65 million for survey work. However, due to the problems the link has suffered the project is expected to cost close t