Skip to main content

Tunnelling option for XCMG

XCMG’s largest tunnel machine, the XTR7/360, has gone straight from the production line to a reconstruction project in a county in Hunan Province. The project is for a tunnel with a full length of 1.2km, an excavation section width of 4.6m, and a height of 6.6m. Above the tunnel are residential buildings and pavement, buried for a depth of about 4m. These buildings have strict requirements on the disturbance on surrounding rock and noise control. The tunnel stratum is all rock roadways. The rocks are limes
May 30, 2018 Read time: 2 mins
XCMG’s largest tunnelling machine is being used on a project in Hunan Province
2490 XCMG’s largest tunnel machine, the XTR7/360, has gone straight from the production line to a reconstruction project in a county in Hunan Province.


The project is for a tunnel with a full length of 1.2km, an excavation section width of 4.6m, and a height of 6.6m. Above the tunnel are residential buildings and pavement, buried for a depth of about 4m. These buildings have strict requirements on the disturbance on surrounding rock and noise control. The tunnel stratum is all rock roadways. The rocks are limestone and granite with saturated uni-axial compressive strength of 90-110MPa, or over 110MPa partially. The project started in 2015, with the tunnel entrance and the tunnel exit commenced at the same time. The entrance was opened up with a hydraulic hammer, while drilling and blasting was used at the other end. However progress was slow and after a few months, the construction team withdrew due to low construction efficiency. Instead the team opted to utilise a tunnelling machine and selected the XTR7/360 from XCMG. This machine has a weight of 145tonnes, a cutting power of 360/280kW and can deliver cutting heights and widths of more than 7m. The machine is said to offer reliability and strong rock breaking ability. The machine can be adapted in various configurations to suit use in different stratum. It is also equipped with advanced features such as smart roll cable, sound and light alarms, soft start, and remote control.

XTR7/360 tunnel boring machine works in the full cross-section of the project. It has withstood hard rock formation and landslide since construction and shown stable performance. The tunneling efficiency has been significantly improved since its entry.

For more information on companies in this article

Related Content

  • Indeco hammers carry out key excavation work in Italian tunnel project
    December 2, 2014
    Indeco breakers have been instrumental in excavating the Serra Rotonda Tunnel along the new Salerno-Reggio Calabria highway in southern Italy - Lucio Garofalo reports The A3 Salerno-Reggio-Calabria highway runs for some 443km, linking the A1 Milano-Napoli with the southernmost part of the country. A tunnel is a major link on this highway and was originally built between 1966 and 1974 in an area where road construction can be a challenge due to orography, geology and seismicity. Since 2001, the A3 has bee
  • Tunnel project of Chilean capital Santiago
    April 8, 2015
    Tunnel construction in Chilean capital Santiago will help cut chronic congestion – Mauro Nogarin & Mike Woof write. Chile’s capital Santiago is a thriving city having benefited from the country’s economy growing strongly in recent years. The massive copper mining sector has helped boost the country’s GDP significantly in the past few decades, also aided by the growing international reputation of Chile’s large wine industry. The steady economic growth has resulted in an equally steady growth in average incom
  • Norway’s record breaking undersea road tunnel
    February 25, 2015
    The world's deepest road tunnel is currently in construction near Stavanger in Norway but is only the prelude to even larger projects - report and photographs by Adrian Greeman. Norway's convoluted coastline of fjords and high mountains is famously scenic but also a major problem for transport and connections. The country has long experience of constructing tunnels as a result. Now a series of tunnels underway, or in design, around the oil industry city of Stavanger will stretch its skills more than usual.
  • Drilling rig meets the utility supply challenge
    April 11, 2012
    A tricky utility supply project has been carried out in difficult conditions in Germany, without disturbing a village access road. The drilling work for the project was operated by boring contractor Beermann and the site was located on a plateau some 5km from the nearest village.