Skip to main content

Tunnelling option for XCMG

XCMG’s largest tunnel machine, the XTR7/360, has gone straight from the production line to a reconstruction project in a county in Hunan Province. The project is for a tunnel with a full length of 1.2km, an excavation section width of 4.6m, and a height of 6.6m. Above the tunnel are residential buildings and pavement, buried for a depth of about 4m. These buildings have strict requirements on the disturbance on surrounding rock and noise control. The tunnel stratum is all rock roadways. The rocks are limes
May 30, 2018 Read time: 2 mins
XCMG’s largest tunnelling machine is being used on a project in Hunan Province
2490 XCMG’s largest tunnel machine, the XTR7/360, has gone straight from the production line to a reconstruction project in a county in Hunan Province.


The project is for a tunnel with a full length of 1.2km, an excavation section width of 4.6m, and a height of 6.6m. Above the tunnel are residential buildings and pavement, buried for a depth of about 4m. These buildings have strict requirements on the disturbance on surrounding rock and noise control. The tunnel stratum is all rock roadways. The rocks are limestone and granite with saturated uni-axial compressive strength of 90-110MPa, or over 110MPa partially. The project started in 2015, with the tunnel entrance and the tunnel exit commenced at the same time. The entrance was opened up with a hydraulic hammer, while drilling and blasting was used at the other end. However progress was slow and after a few months, the construction team withdrew due to low construction efficiency. Instead the team opted to utilise a tunnelling machine and selected the XTR7/360 from XCMG. This machine has a weight of 145tonnes, a cutting power of 360/280kW and can deliver cutting heights and widths of more than 7m. The machine is said to offer reliability and strong rock breaking ability. The machine can be adapted in various configurations to suit use in different stratum. It is also equipped with advanced features such as smart roll cable, sound and light alarms, soft start, and remote control.

XTR7/360 tunnel boring machine works in the full cross-section of the project. It has withstood hard rock formation and landslide since construction and shown stable performance. The tunneling efficiency has been significantly improved since its entry.

For more information on companies in this article

Related Content

  • Drilling rig meets the utility supply challenge
    May 9, 2012
    A tricky utility supply project has been carried out in difficult conditions in Germany, without disturbing a village access road. The drilling work for the project was operated by boring contractor Beermann and the site was located on a plateau some 5km from the nearest village.
  • Advances in tunneling machines coming to market
    November 19, 2015
    A diverse array of new tunnelling technologies will help boost productivity and cut project costs, while boosting quality - Mike Woof writes The worldwide market for tunnelling projects continues to be strong, with a series of major projects underway or planned for the future. These good market conditions have helped fuel research and development in new tunnelling equipment, designed to be more productive, more efficient and more reliable and able to deliver a higher quality of work. Drilling and blas
  • Tunnelling project under Micang Mountain
    October 15, 2018
    Equipment from XCMG has played an important role in the excavation of a new tunnel link underneath the Micang Mountain in China. The project to build the right-hand bore for the Micang Mountain tunnel on the Sichuan-Shaanxi Expressway has taken 54 months to complete. The tunnel was needed as the Micang Mountain has been a barrier to direct transportation at the junction of Hanzhong and Bazhong. This has blocked the major transport route between Sichuan and Shaanxi, preventing traffic flows across the reg
  • Major Necaxa-Tihuatlan Highway project for Mexico
    October 1, 2014
    A new highway in Mexico is connecting Necaxa with Tihuatlan and the project features challenging terrain - Mauro Nogarin reports In Mexico a landmark highway project is now close to completion, having set a number of records for Latin America.