Skip to main content

Sennenbogen’s 6130 HD with diaphragm wall grab on site in Berlin

Berger Grundbautechnik is using two Sennenbogen duty cycle cranes simultaneously for preparatory works for the planned BAB 100 motorway in Berlin. The new stretch of motorway will connect the eastern areas of Berlin to the central road circuit and the BAB 113. Large sections of the section being built run in a tunnel or in a trough of up to 7m. Hard at it are the Sennenbogen 690 HD and the new 6130 HD units. With a working weight of 130tonnes and two 300kN free-fall winches, the 6130 HD operates a 25tonne
December 18, 2017 Read time: 2 mins
Sennenbogen’s 6130 HD: preparatory work for the BAB 100 motorway

Berger Grundbautechnik is using two Sennenbogen duty cycle cranes simultaneously for preparatory works for the planned BAB 100 motorway in Berlin.

The new stretch of motorway will connect the eastern areas of Berlin to the central road circuit and the BAB 113. Large sections of the section being built run in a tunnel or in a trough of up to 7m. Hard at it are the Sennenbogen 690 HD and the new 6130 HD units.

With a working weight of 130tonnes and two 300kN free-fall winches, the 6130 HD operates a 25tonne diaphragm wall grabber for digging diaphragm walls at depths up to 25m.

The 6130 machine is also driven by a powerful 570kW diesel engine which ensures sufficient power reserves. The free-fall speed with the two winches is easily regulated via a potentiometer. The machine's powerful winch strength and high load capacity allow for a fluid and rapid work process, even with heavy grapples.

To be precise, the driver first inserts the grapple into the recess and then allows this to fall repeatedly against the ground with the shovel open. This action loosens the material which can then be dug up from below ground. The smooth sand-gravel wash is then deposited directly beside the machine.

The result is an exact, straight diaphragm wall construction which, with the addition of reinforced concrete, later becomes the foundation for building. The driver requires only a couple of minutes for one cycle - from sinking the grapple to breaking up the sand layers to unloading the material.

Despite the high dynamic requirements, the duty cycle crane remains stable and secure due to its particularly well-balanced machine conception with the 7.2m long track rollers. The caterpillar undercarriage telescopes out hydraulically to a track width of up to 4.1m. In the current configuration, the machine works with a heavy-duty boom running up to 27m long.

Related Content

  • McCloskey’s latest washing systems offer increase performance
    March 1, 2017
    Washing equipment specialist, McCloskey Washing Systems is introducing three new developments intended to lower operating costs and increase output for quarrying firms. The innovative SandStorm modular wash plants incorporate feeding, screening, aggregate and sand washing along with stockpiling of all products on a single, compact modular chassis.
  • Earthmoving machine advances
    June 10, 2019
    One of the most competitive segments of the off-highway equipment sector, it is no surprise that earthmoving machinery is seeing a wide array of new models coming to market - Mike Woof writes Competition is tough in the market for earthmoving equipment. Manufacturers from Europe, the US, Japan, Korea and China are all vying for increased market share across the globe. Firms are developing new models and widening product lines, with a wide range of excavator, wheeled loader, dozer, grader and soil compact
  • Modern formwork systems - fast, flexible, safe
    February 21, 2012
    Speed of erection, safety, cost-efficiency and flexibility are among the attributes of modern formwork systems. Modern formwork and scaffolding systems are attractive in particular for their speed of erection, safety, cost-efficiency and flexibility.
  • New Turkish bridge to complete highway
    July 15, 2015
    A modern, six-lane suspension bridge is under construction across the Sea of Marmara near the western Turkish town of Izmit. Turkish crane service provider Aydin Vinc is putting a 180tonne Sennebogen 5500 crawler crane to good use on lifting and logistics tasks. When finished in 2017, the six-lane Izmit Bay Bridge, 50km east of Istanbul, will carry more than 5,000 vehicles per day. The suspension bridge will not only complete the highway from Istanbul south to Izmir on the Aegean coast, it will also be t