Skip to main content

Sennenbogen’s 6130 HD with diaphragm wall grab on site in Berlin

Berger Grundbautechnik is using two Sennenbogen duty cycle cranes simultaneously for preparatory works for the planned BAB 100 motorway in Berlin. The new stretch of motorway will connect the eastern areas of Berlin to the central road circuit and the BAB 113. Large sections of the section being built run in a tunnel or in a trough of up to 7m. Hard at it are the Sennenbogen 690 HD and the new 6130 HD units. With a working weight of 130tonnes and two 300kN free-fall winches, the 6130 HD operates a 25tonne
December 18, 2017 Read time: 2 mins
Sennenbogen’s 6130 HD: preparatory work for the BAB 100 motorway

Berger Grundbautechnik is using two Sennenbogen duty cycle cranes simultaneously for preparatory works for the planned BAB 100 motorway in Berlin.

The new stretch of motorway will connect the eastern areas of Berlin to the central road circuit and the BAB 113. Large sections of the section being built run in a tunnel or in a trough of up to 7m. Hard at it are the Sennenbogen 690 HD and the new 6130 HD units.

With a working weight of 130tonnes and two 300kN free-fall winches, the 6130 HD operates a 25tonne diaphragm wall grabber for digging diaphragm walls at depths up to 25m.

The 6130 machine is also driven by a powerful 570kW diesel engine which ensures sufficient power reserves. The free-fall speed with the two winches is easily regulated via a potentiometer. The machine's powerful winch strength and high load capacity allow for a fluid and rapid work process, even with heavy grapples.

To be precise, the driver first inserts the grapple into the recess and then allows this to fall repeatedly against the ground with the shovel open. This action loosens the material which can then be dug up from below ground. The smooth sand-gravel wash is then deposited directly beside the machine.

The result is an exact, straight diaphragm wall construction which, with the addition of reinforced concrete, later becomes the foundation for building. The driver requires only a couple of minutes for one cycle - from sinking the grapple to breaking up the sand layers to unloading the material.

Despite the high dynamic requirements, the duty cycle crane remains stable and secure due to its particularly well-balanced machine conception with the 7.2m long track rollers. The caterpillar undercarriage telescopes out hydraulically to a track width of up to 4.1m. In the current configuration, the machine works with a heavy-duty boom running up to 27m long.

Related Content

  • Tough new grapples for demolition and sorting
    June 4, 2019
    KINSHOFER is now offering its D-Series grapples with a new light, compact and flexible shell, ideal for sorting and demolition. The attachments feature 360° rotation for precise positioning to give construction, demolition and recycling contractors optimal control when grabbing materials. The D-series grapples are available for mini excavators weighing from 2tonnes to heavy-duty excavators weighing up to 80tonnes. The firm says that the D-Series offers jobsite versatility to customers. The units allow ex
  • Improved dozing from Case’s latest M-series machines
    April 26, 2018
    Case is offering its three latest M-Series dozers, which are said to offer higher pushing power and increased grading accuracy. The machines have FPT engines rated at 97, 123 and 194kW, which meet Tier 4 Interim emissions requirements. Drive is hydrostatic, allowing full power in turns, as well as fine control for fine grading or slope duties. The dozer is equipped as standard with machine control technology from Leica Geosystems, with whom Case CE has a partnership. Customers have a choice of 2D or 3D pack
  • Bobcat’s Vertikal Telehandlers
    July 18, 2012
    Bobcat was due to unveil its new TR50210 rotary telescopic handler and high horsepower TL470HF telescopic handlers for the first time at the Vertikal Days Exhibition at Haydock Park, Merseyside, north-west England from 27-28 June. The rotating capability of the new telehandlers range is said to allow the machines to serve the needs of an entire site from just one position. Capable of being set up in a matter of minutes, they are described as offering exceptional stability for lifting heavy materials either
  • Bridges in Sunderland and Poland are being slid into place
    February 6, 2017
    Sunderland sees a bridge slide into place and two bridges inch their way across a Polish highway Slowly but surely, a 2,500 tonne section of a new bridge deck was eased out from the banks of the River Wear near Sunderland in northern England. It now straddles the water, pointing towards the opposite bank which it will eventually reach after another sliding operation likely to take place next year. The project to build the New Wear Crossing is now halfway through with the first half of the steel deck b