Skip to main content

Sennebogen gives Danube bridge restoration a lift

Built in the 12th century, the Stone Bridge spans the River Danube as the most significant emblem of the city of Regensburg, in southern Germany. In the course of the protracted restoration work, Strabag is using a new Sennebogen 608 Multicrane for various lifting and construction tasks. Although the historic structure of the city was built within only 11 years, between 1135 and 1146, the restoration tasks for the Stone Bridge at Regensburg have been underway for three years and are not expected to be co
April 2, 2014 Read time: 2 mins
Built in the 12th century, the Stone Bridge spans the River Danube as the most significant emblem of the city of Regensburg, in southern Germany. In the course of the protracted restoration work, Strabag is using a new 2924 Sennebogen 608 Multicrane for various lifting and construction tasks.

Although the historic structure of the city was built within only 11 years, between 1135 and 1146, the restoration tasks for the Stone Bridge at Regensburg have been underway for three years and are not expected to be completed until the end of 2017.

Currently the existing access ramp to the Oberer Wöhrd municipal area is being rebuilt by 945 Strabag’s Roding Branch, partly with the help of the 608 Multicrane as a construction site crane.

Equipped with a 91kW diesel engine, and thanks to the compact dimensions and convenient all-wheel steering, the mobile 608 model is said to be particularly well-suited for this deployment site, located between the two arms of the Danube. At a height of just 3.15m and a width of 2.55m, the machine is easy to move and can also be used under the narrow arches of the bridge.

For more information on companies in this article

Related Content

  • Bavarian Autobahn bridge repairs
    March 11, 2019
    Austrian contractor STRABAG is heading a consortium that will carry out bridge upgrades on the busy A9 Autobahn connecting Nuremburg with Munich in Bavaria, southern Germany. The eight bridges between the Nuremburg/Feucht interchange and the Hipoltstein junction will be demolished and replaced with new structures. The deal is worth € 38 million and will be handled by the consortium comprising STRABAG, subdivision Bavaria North, and Ed Züblin, Subdivision Bridge Construction. The client for the project is Au
  • Concrete paving a smoother surface using machine control technology
    May 17, 2017
    Innovative technology has been used to deliver a smooth concrete road surface on a busy stretch of highway in Nebraska. Much-needed work on a busy section of Interstate 80 has been carried out in Nebraska to improve the road surface. This is one of the most important highways in the US, providing a link that stretches right across the country between the east and west coasts. This busy highway carries a high percentage of heavy truck traffic as it is a vital transport route. However this constant flow of la
  • Why Hitachi rental electric excavators are a perfect fit
    July 1, 2025
    When Jurgen van Uijthoven needed an electric excavator for a short-term project, he knew exactly who to ask. The long-standing customer of Hitachi Construction Machinery sub-dealer Pellen BV found an ideal solution to win the tender and complete the work.
  • A virtual virtuous circle
    March 19, 2021
    Virtual sensors will allow a safer driving experience and reduce road maintenance costs. Tactile Mobility’s Eitan Grosbard talks to David Arminas