Skip to main content

Sennebogen gives Danube bridge restoration a lift

Built in the 12th century, the Stone Bridge spans the River Danube as the most significant emblem of the city of Regensburg, in southern Germany. In the course of the protracted restoration work, Strabag is using a new Sennebogen 608 Multicrane for various lifting and construction tasks. Although the historic structure of the city was built within only 11 years, between 1135 and 1146, the restoration tasks for the Stone Bridge at Regensburg have been underway for three years and are not expected to be co
April 2, 2014 Read time: 2 mins
Built in the 12th century, the Stone Bridge spans the River Danube as the most significant emblem of the city of Regensburg, in southern Germany. In the course of the protracted restoration work, Strabag is using a new 2924 Sennebogen 608 Multicrane for various lifting and construction tasks.

Although the historic structure of the city was built within only 11 years, between 1135 and 1146, the restoration tasks for the Stone Bridge at Regensburg have been underway for three years and are not expected to be completed until the end of 2017.

Currently the existing access ramp to the Oberer Wöhrd municipal area is being rebuilt by 945 Strabag’s Roding Branch, partly with the help of the 608 Multicrane as a construction site crane.

Equipped with a 91kW diesel engine, and thanks to the compact dimensions and convenient all-wheel steering, the mobile 608 model is said to be particularly well-suited for this deployment site, located between the two arms of the Danube. At a height of just 3.15m and a width of 2.55m, the machine is easy to move and can also be used under the narrow arches of the bridge.

For more information on companies in this article

Related Content

  • Bordeaux gets sixth bridge, Simone Veil Bridge, formerly JJ Bosc
    July 11, 2017
    The French city of Bordeaux has awarded Razel-Bec a contract for construction of a new bridge across the Garonne River. The city of Bordeaux awarded Razel-Bec one of the largest urban development project in France, construction of the Simone Veil Bridge. The 550m bridge over the River Garonne will be 45m wide and lie between Bordeaux and the city of Floriac. Construction will start in September and take around 32 months. Cost will be nearly €83.9 million.
  • Less edge spalling and a perfect joint pattern with Bomag
    June 27, 2023
    The BPR 60/65 D STONEGUARD paving plate builds quality.
  • Special purpose add-ons for demolition excavators
    February 16, 2012
    Long reach demolition excavators are now special purpose machines, Dan Gilkes reports. The majority of construction equipment manufacturers offer a range of demolition specific machines, built to meet the needs of a sector of the industry that works its plant harder than most.
  • Special purpose add-ons for demolition excavators
    April 13, 2012
    Long reach demolition excavators are now special purpose machines, Dan Gilkes reports The majority of construction equipment manufacturers offer a range of demolition specific machines, built to meet the needs of a sector of the industry that works its plant harder than most. Reinforced structures, additional hydraulic services, cab and body protection, dust suppression and additional engine air cleaners are just some of the standard alterations required by the demolition contractor. For many years exca