Skip to main content

Safety on 'The King's Highway

California State Route 82 in the United States, a major urban arterial, is part of the historic El Camino Real or The King's Highway, connecting the communities of San Jose and San Francisco in northern California. Consisting of two to three lanes in each direction with a median, on level terrain and tangent alignment, the route between Hickey Boulevard in Colma and Mission Road in south San Francisco carries 17,400 vehicles/day
February 23, 2012 Read time: 2 mins
FG 300 Curb System improves safety on the historic El Camino Real
California State Route 82 in the United States, a major urban arterial, is part of the historic El Camino Real or The King's Highway, connecting the communities of San Jose and San Francisco in northern California.

Consisting of two to three lanes in each direction with a median, on level terrain and tangent alignment, the route between Hickey Boulevard in Colma and Mission Road in south San Francisco carries 17,400 vehicles/day and consists of two lanes in each direction with a 30.5cm wide double yellow stripe.

2451 California Department of Transportation (Caltrans) accident data revealed that in the five-year period from September 1998 to September 2003, 20 out of a total 68 accidents on the highway were cross centreline accidents: five resulted in injuries and one in a fatality.

Widening the highway would have been very costly and the project would have taken years to develop, so to reduce accidents on this stretch, Caltrans initiated a project to install 793m of raised curb separators along the centreline using the Davidson FG 300 Interstate Grade Curb System from Filtrona Extrusion (2299 DAVIDSON Traffic Control Products is part of Filtrona Extrusion, a global manufacturer of plastic products whose product line Type I, II and III barricades, curb system lane separators, work zone pavement markers, flexible delineator posts, and reflectors for barrier walls and guardrails).

Roland Au-Yeung , district traffic engineer with Caltrans in Oakland, California, said: "The raised separator provides a very visible delineation of the centreline, which we believe will reduce cross-over type accidents. The installation of the raised separator system was a quick and cost effective way to reduce such accidents for this location."

Caltrans has field reviewed the location after the installation and is "very pleased" with the improvement.

The FG 300 Interstate Grade Curb System is a raised median separator that features flexible, tubular upright posts manufactured using a design and a special polyurethane chemistry, and has been impact tested and NCHRP 350 accepted by the 2410 Federal Highway Administration (FHWA) for use on US highways.

Related Content

  • California bridge receiving constant attention
    May 29, 2012
    The MISTRAS Group is handling a US$3.4 million contract for continuous structural health monitoring on the San Francisco Oakland Bay Bridge. The client for this contract is the California Department of Transportation (CALTRANS) and MISTRAS will be responsible for installing and operating the package. The system is being installed on the bridge in response to a fatigue defect found on a structural steel beam in a regularly scheduled inspection during a holiday closure in 2009.
  • Safety barriers deliver valuable road user protection
    February 14, 2012
    Safety barriers provide an invaluable service for all road users, Mike Woof reports The safety barrier market is a key one for the highway sector, with systems providing valuable protection for all categories of road users. The importance of passive protective devices such as safety barriers can often be overlooked by the road user but is well-understood by highway designers. Redirecting an errant vehicle back into the roadway and preventing it from crossing into traffic flowing in the other direction or fr
  • Historic Oakland Bay Bridge receives a new asphalt road surface
    March 31, 2014
    Part of an iconic US bridge has been given a new lease of life, as Mike Woof reports The western section of the historic Oakland Bay Bridge in the US state of California has recently benefited from a series of improvements to strengthen its structural integrity and also upgrade the running surface. Contractor OC Jones & Sons of Berkeley CA, paved large portions of the bridge, taking on two different projects as part of the work. First was placement of the specialised epoxy on the self-anchored suspension (S
  • Machine control technology shortens road contract
    May 28, 2013
    The use of sophisticated machine control technology has helped halve the schedule required for a road contract – Jeff Winke. By using the latest machine control systems on the equipment fleet, a US contractor has managed to halve worker hours, machine time and overall costs. “We chopped 50% off the contract schedule,” said Jim Swenson, licensed professional land surveyor for Oregon Mainline Paving based in McMinnville, Oregon. “The project was completed a year ahead of the two-year schedule,” he explained