Skip to main content

California bridge receiving constant attention

The MISTRAS Group is handling a US$3.4 million contract for continuous structural health monitoring on the San Francisco Oakland Bay Bridge. The client for this contract is the California Department of Transportation (CALTRANS) and MISTRAS will be responsible for installing and operating the package. The system is being installed on the bridge in response to a fatigue defect found on a structural steel beam in a regularly scheduled inspection during a holiday closure in 2009.
May 29, 2012 Read time: 2 mins
The 5774 MISTRAS Group is handling a US$3.4 million contract for continuous structural health monitoring on the San Francisco Oakland Bay Bridge. The client for this contract is the 2451 California Department of Transportation (CALTRANS) and MISTRAS will be responsible for installing and operating the package. The system is being installed on the bridge in response to a fatigue defect found on a structural steel beam in a regularly scheduled inspection during a holiday closure in 2009.

The bridge opened in 1936 and has one of the largest spans in the world, carrying some 250,000 vehicles/day at present. The MISTRAS system will remotely and continuously monitor 384 critical eye bars for the early detection of fatigue defects using its advanced real time software, listening to 640 strategically placed acoustic emission sensors mounted on the bridge's eye bars.

The package will automatically send a message alert to engineering personnel in the event of a flaw indication being detected, including its location. When delivered, this will possibly be the largest and most advanced automated structural health monitoring system in the world according to MISTRAS.

For more information on companies in this article

Related Content

  • Presidio Parkway: the Golden Gate Bridge’s new southern approach road
    May 29, 2013
    Work on the Presidio Parkway, a new breathtaking and eco-friendly southern approach road to San Francisco’s Golden Gate Bridge, has entered its crucial second and final phase. As Guy Woodford reports, the vital US$1 billion project has overcome legal as well as environmental challenges to stay on course for its expected 2016 completion Just after 9pm on Friday April 27, 2012 a large public crowd looked on excitedly as a fleet of more than 40 R&L Brosamer and Ferma Corporation deployed hydraulic demolition h
  • Right ways to deter wrong-way
    August 6, 2020
    After research, California’s Caltrans is reviewing its highway design standards.
  • Delay to SF-Oakland Bay Bridge East Span opening and probe report
    July 9, 2013
    The Toll Bridge Program Oversight Committee (TBPOC) today said that the previously scheduled Labor Day (2 Sep) opening of the new East Span of the San Francisco-Oakland Bay Bridge has been postponed. News of the delayed opening was announced at the same time as TBPOC released its investigative report into the 32 bolts that broke on the Bay Bridge in March 2013, and its review of other bolts on the bridge. The contractor now forecasts that the steel saddle retrofit of the failed bolts on the east pier will b
  • Historic Oakland Bay Bridge receives a new asphalt road surface
    March 31, 2014
    Part of an iconic US bridge has been given a new lease of life, as Mike Woof reports The western section of the historic Oakland Bay Bridge in the US state of California has recently benefited from a series of improvements to strengthen its structural integrity and also upgrade the running surface. Contractor OC Jones & Sons of Berkeley CA, paved large portions of the bridge, taking on two different projects as part of the work. First was placement of the specialised epoxy on the self-anchored suspension (S