Skip to main content

California bridge receiving constant attention

The MISTRAS Group is handling a US$3.4 million contract for continuous structural health monitoring on the San Francisco Oakland Bay Bridge. The client for this contract is the California Department of Transportation (CALTRANS) and MISTRAS will be responsible for installing and operating the package. The system is being installed on the bridge in response to a fatigue defect found on a structural steel beam in a regularly scheduled inspection during a holiday closure in 2009.
May 29, 2012 Read time: 2 mins
The 5774 MISTRAS Group is handling a US$3.4 million contract for continuous structural health monitoring on the San Francisco Oakland Bay Bridge. The client for this contract is the 2451 California Department of Transportation (CALTRANS) and MISTRAS will be responsible for installing and operating the package. The system is being installed on the bridge in response to a fatigue defect found on a structural steel beam in a regularly scheduled inspection during a holiday closure in 2009.

The bridge opened in 1936 and has one of the largest spans in the world, carrying some 250,000 vehicles/day at present. The MISTRAS system will remotely and continuously monitor 384 critical eye bars for the early detection of fatigue defects using its advanced real time software, listening to 640 strategically placed acoustic emission sensors mounted on the bridge's eye bars.

The package will automatically send a message alert to engineering personnel in the event of a flaw indication being detected, including its location. When delivered, this will possibly be the largest and most advanced automated structural health monitoring system in the world according to MISTRAS.

For more information on companies in this article

Related Content

  • The use of telematics in construction machines is growing
    May 20, 2015
    Demand for telematics technology is growing, as equipment users begin to lean the value of these systems – Alan Dron reports With construction projects increasingly operating to wafer-thin profit margins, any technological assistance that can keep the accounts in the black is welcome. This is particularly the case with those projects where contractors can share a larger slice of the profits if they complete their work ahead of schedule. The downside, of course, is that they also share the pain if the
  • Towers of power: California’s Gerald Desmond Bridge Replacement
    May 8, 2019
    Challenging ground conditions meant a design rethink - and some engineering firsts - for California’s Gerald Desmond Bridge Replacement Project* The Port of Long Beach on Terminal Island south of Los Angeles is the second-busiest container port in the US. It handles around 15% of all imported goods, much of it with Asia. As the Port of Long Beach was growing in importance over the past half century, the 51-year-old Gerald Desmond Bridge has faithfully been delivering thousands of daily commuters to wo
  • Golden route to success
    July 20, 2012
    Built in 1937 and still the ninth longest suspension bridge in the world, the Golden Gate Bridge across San Francisco Bay remains in fine shape despite its age - Andrew Bardin Williams writes The Golden Gate Bridge turned 75 years old on May 27 and continues to play a key role in the transportation, engineering, construction and ITS communities. The structure has played an important historical role, an engineering success that boosted the economy of the region. And it also led the way as the first major pub
  • Right ways to deter wrong-way
    November 11, 2020
    After a pilot programme, California’s Caltrans is reviewing its highway design standards