Skip to main content

Safer bridges

Barin is supplying a new underbridge inspection platform to a Canadian customer, as well as a unit to a firm in Russia. The ABC190/L for Canada is the first machine Barin has supplied to the country and the customer is rental company Jenik Construction, based in St Mathieu de Veloil. The platform is mounted on a five axle Freightliner M2-112 truck chassis and can operate from a single lane of traffic. It offers a bridge barrier clearance of 4.4m, a pavement/sidewalk clearance of 4.4m and a horizontal underb
July 2, 2012 Read time: 2 mins
The Barin platform bought by Uralmostrotroj on Russia will be used to inspect and maintain the Kama Bridge in Perm
1481 Barin is supplying a new underbridge inspection platform to a Canadian customer, as well as a unit to a firm in Russia. The ABC190/L for Canada is the first machine Barin has supplied to the country and the customer is rental company Jenik Construction, based in St Mathieu de Veloil. The platform is mounted on a five axle Freightliner M2-112 truck chassis and can operate from a single lane of traffic. It offers a bridge barrier clearance of 4.4m, a pavement/sidewalk clearance of 4.4m and a horizontal underbridge extension of 19m. The unit also offers a maximum underbridge vertical platform depth of 9m, a platform capacity of 600kg and a platform width of 1.3m. The platform can be fully deployed in 12 minutes, features manually-operated, vertical aluminium lift that can rise 2.5m with a 120kg load and offers a total GVW of 37tonnes.

The Russian unit is an ABC200/L model and was bought by Uralmostotroj based in Perm and will be used to maintain the Kama Bridge. The 500kg capacity platform is mounted on a 6x4 2394 Volvo FM400 chassis and offers a bridge barrier clearance of 2.1m, a sidewalk/pavement clearance of 2.7m, a horizontal underbridge outreach of 20m and a maximum vertical underbridge depth of 8.5m. Total GVW is 26tonnes and the machine can be fully deployed in 12 minutes, while it also features an aluminium lift with similar specifications to the Canadian machine that can be raised by 3m.

For more information on companies in this article

Related Content

  • Sennebogen premieres 70tonne telescopic crane
    April 19, 2013
    Sennebogen has plugged the gap in its telescopic crawler crane range with the introduction of the 673R-HD. The 70tonne capacity machine sits between the firm’s 40 and 80tonne models, offering a 36m four-stage main boom with two fly booms of 8m and 15m. This gives a maximum reach of 51m. The 673R-HD is powered by a Stage IIIB/Tier 4 Interim standard Deutz engine delivering 160kW. Telescopic track frames allow for a maximum transport width of just 3m, with fast set-up on site as they extend out to provide sta
  • Moving the earth with improved environmental credentials
    August 9, 2018
    Driver comfort, more power and improved environmental credentials highlight some of the latest earthmoving equipment Doosan Construction Equipment has launched a new version of the company’s DA30 30tonne class articulated dump truck (ADT), now in a new colour scheme. Most of the changes are for better operator comfort and controllability of the machine. But there are also changes in the driveline and electrical systems. The most important development is an upgrade of the suspension to a hydro-gas self-lev
  • Cold road reclamation in South Africa
    July 18, 2012
    Raubex Construction’s new Cat RM500 rotary mixer is proving its worth on a road reclamation work on a South African highway Part of an extensive motorway network some 185km long, South Africa’s ongoing Gauteng Freeway Improvement Project (GIFP) is creating a modern, world-class toll route system. The new road will provide major impetus to socio-economic growth in the country’s most populous and commercially active region. Being built in stages by the South African National Roads Authority (SANRAL), these r
  • India’s capital highway project will improve transport connections
    October 10, 2017
    Huge numbers of construction machines as well as plant and equipment are working overtime, backed by mammoth manpower, to meet the targeted completion deadline of March 2018 for India’s Eastern Peripheral Expressway (EPE). The 135km arterial route is being built with six lanes and surrounds India’s National Capital, Delhi, its National Capital Region (NCR) and the industrially developed North Indian states of Haryana and Uttar Pradesh.