Skip to main content

Safer bridges

Barin is supplying a new underbridge inspection platform to a Canadian customer, as well as a unit to a firm in Russia. The ABC190/L for Canada is the first machine Barin has supplied to the country and the customer is rental company Jenik Construction, based in St Mathieu de Veloil. The platform is mounted on a five axle Freightliner M2-112 truck chassis and can operate from a single lane of traffic. It offers a bridge barrier clearance of 4.4m, a pavement/sidewalk clearance of 4.4m and a horizontal underb
July 2, 2012 Read time: 2 mins
The Barin platform bought by Uralmostrotroj on Russia will be used to inspect and maintain the Kama Bridge in Perm
1481 Barin is supplying a new underbridge inspection platform to a Canadian customer, as well as a unit to a firm in Russia. The ABC190/L for Canada is the first machine Barin has supplied to the country and the customer is rental company Jenik Construction, based in St Mathieu de Veloil. The platform is mounted on a five axle Freightliner M2-112 truck chassis and can operate from a single lane of traffic. It offers a bridge barrier clearance of 4.4m, a pavement/sidewalk clearance of 4.4m and a horizontal underbridge extension of 19m. The unit also offers a maximum underbridge vertical platform depth of 9m, a platform capacity of 600kg and a platform width of 1.3m. The platform can be fully deployed in 12 minutes, features manually-operated, vertical aluminium lift that can rise 2.5m with a 120kg load and offers a total GVW of 37tonnes.

The Russian unit is an ABC200/L model and was bought by Uralmostotroj based in Perm and will be used to maintain the Kama Bridge. The 500kg capacity platform is mounted on a 6x4 2394 Volvo FM400 chassis and offers a bridge barrier clearance of 2.1m, a sidewalk/pavement clearance of 2.7m, a horizontal underbridge outreach of 20m and a maximum vertical underbridge depth of 8.5m. Total GVW is 26tonnes and the machine can be fully deployed in 12 minutes, while it also features an aluminium lift with similar specifications to the Canadian machine that can be raised by 3m.

For more information on companies in this article

Related Content

  • Bridge inspection unit key to maintenance
    April 11, 2012
    A new bridge inspection unit is carrying out vital work in Vietnam.
  • China deal for Barin unit
    August 20, 2012
    Italian company Barin has supplied bridge inspection equipment in China. The model ABC 60/l belongs to the automatic bridge control range and the deal was handled by Barin’s distributor company in Hong Kong, New Motion. The skid unit machine, mounted on a two-axle Nissan truck chassis, was shipped in a container in pieces and then reassembled locally. The unit, made of aluminium alloy, is an underbridge platform-type machine with a maximum undebridge working length of 6m, and has a total payload of 300kg.
  • Flexible under-bridge inspection unit
    March 21, 2012
    Barin has exported its ABC 60/L skid unit machine to Brazil for use in bridge inspections in the South American country. The machine, which has an under bridge working length of 6m, has been mounted on a two-axle Iveco Daily 70C16 truck chassis by a Barin technician based in Brazil. Supplied to Rentavale Equipamentos LTDA, based in Sao Paulo, the ABC 60/L is made of aluminium alloy and has fixed and sliding elements, the latter extending up to 6,000mm horizontally whilst under bridge. Its platform width is
  • Well structured maintenance
    January 4, 2013
    Major bridge maintenance and replacement projects across the world are extending the life of many impressive historic landmarks as Guy Woodford reports The Tamar Bridge, part of the main A38 trunk road linking Saltash in Cornwall with Plymouth in Devon, south west England, marked its 50th anniversary with a steel deck resurfacing project involving Stirling Lloyd's Eliminator bridge deck waterproofing system. Jointly owned by Plymouth City Council and Cornwall Council, the Tamar has a suspended length of 642