Skip to main content

Liebherr tower cranes operating at Santiago airport

the Santiago Nueva Pudahuel International airport development is benefiting from the proximity of Liebherr’s branch location in Chile. At the moment, 18 of the 23 Liebherr tower cranes are in operation on the large-scale construction site. Of the machines in use, three are high-top models and 15 are flat-top types. The airport in Santiago de Chile is expanding its position as a key hub airport for South America. The operators are extending the site to 265,000m² and have commissioned the construction of a
January 14, 2019 Read time: 3 mins
A total of 23 Liebherr tower cranes are being used for the airport expansion project in Santiago de Chile

718 Liebherr is supplying no less than 23 tower cranes for use on the airport expansion project in Santiago de Chile. The 5177 Vinci-1324 Astaldi consortium working on the Santiago Nueva Pudahuel International airport development is benefiting from the proximity of Liebherr’s branch location in Chile. At the moment, 18 of the 23 Liebherr tower cranes are in operation on the large-scale construction site. Of the machines in use, three are high-top models and 15 are flat-top types.

The airport in Santiago de Chile is expanding its position as a key hub airport for South America. The operators are extending the site to 265,000m² and have commissioned the construction of another terminal. Once finished, the airport will increase its total capacity to 30 million passengers/year, more than doubling its present number. There will be 67 passenger bridges in total, including the 18 already in use. In addition, capacity for vehicle parking will double.

Liebherr Chile has already erected seven 250 EC-B 12 Litronic, four 150 EC-B 8 Litronic cranes and one 280 EC-H 16 Litronic crane. Six cranes from the Chilean dealer Maquinarias Cruz del Sur are also in use: one 280 EC-H 12 Litronic, two 200 EC-H 10 Litronic and three 90 EC-B cranes. The 18 tower cranes have a jib length of 45-60m; they have been working on the construction site, since the end of 2016, with much  of the work now completed.

More Liebherr tower cranes will follow for the construction of the multi-storey car parks; three 110 EC-B 6 and two 154 EC-H cranes.

The location of a Liebherr branch in Santiago was a key factor for the Vinci-Astaldi consortium. In addition to the Liebherr tower cranes from its own fleet, the dealer Maquinarias Cruz del Sur is providing assembly, service and crane operators for all cranes.

The Liebherr Tower Cranes Solutions project department has provided the consortium with guidance for planning the most economical coverage of the construction site.

In airport construction, the permitted crane heights are very limited. In order to work with several cranes in tight spaces, the technicians mounted a Flat-Top 250 EC-B 12 Litronic crane on rails to build one of the terminals. This allows the crane to cover a large area, while it can also be moved to a position where it can slew freely. As a safety measure, all cranes are equipped with an anti-collision system from French manufacturer AMCS.

For more information on companies in this article

Related Content

  • Moscow crane deal for Manitowoc
    June 25, 2018
    Moscow-based crane rental company TOPKRAN-RENT has purchased four new Potain Hup cranes The deal is of note as these are the first units of this type to be sold in Russia. The four new Hup 40-30 self-erecting cranes are being put to work on a four-month project in the capital. TOPKRAN-RENT is already familiar with the Potain self-erecting cranes from Manitowoc, having previously purchased several Igo 50 cranes – the biggest model in the Igo range. Like the existing Igo cranes from the firm, the new Hup r
  • World’s largest bridge deck for KAIA expansion
    December 16, 2013
    A bespoke formwork solution from RMD Kwikform is playing a key role in creating the largest ever airport cast bridge deck as part of the multi-billion dollar expansion of King Abdulaziz International Airport near Jeddah, Saudi Arabia. The firm is also a leading player in the creation of arterial tunnels under the airport’s elevated roads, another key part of the project’s first phase works due for completion in 2014. Guy Woodford reports
  • Concrete paving key to Berlin's airport runways
    February 17, 2012
    High production concrete paving is proving a key feature at the new Berlin airport facility currently under construction The new Berlin-Brandenburg International Airport will soon provide improved links by air to the city. Work started in mid 2006 with the redevelopment of the existing Berlin Schönefeld Airport.
  • Finnish airport paving contract
    October 12, 2012
    The Finnish contractor Lemminkäinen is currently working on a paving contract for Finavia, the company which maintains Finland's airports. The contract includes paving milling, as well as paving work for runway 3 and taxiways at Helsinki- Vantaa airport. Lemminkäinen began its operations on the €20 million paving contract in April 2012 and the work is expected to end in the autumn of 2014. Helsinki-Vantaa Airport is an important traffic hub for Finland, as well as for the region, with around 15 million pass