Skip to main content

Liebherr tower cranes operating at Santiago airport

the Santiago Nueva Pudahuel International airport development is benefiting from the proximity of Liebherr’s branch location in Chile. At the moment, 18 of the 23 Liebherr tower cranes are in operation on the large-scale construction site. Of the machines in use, three are high-top models and 15 are flat-top types. The airport in Santiago de Chile is expanding its position as a key hub airport for South America. The operators are extending the site to 265,000m² and have commissioned the construction of a
January 14, 2019 Read time: 3 mins
A total of 23 Liebherr tower cranes are being used for the airport expansion project in Santiago de Chile

718 Liebherr is supplying no less than 23 tower cranes for use on the airport expansion project in Santiago de Chile. The 5177 Vinci-1324 Astaldi consortium working on the Santiago Nueva Pudahuel International airport development is benefiting from the proximity of Liebherr’s branch location in Chile. At the moment, 18 of the 23 Liebherr tower cranes are in operation on the large-scale construction site. Of the machines in use, three are high-top models and 15 are flat-top types.

The airport in Santiago de Chile is expanding its position as a key hub airport for South America. The operators are extending the site to 265,000m² and have commissioned the construction of another terminal. Once finished, the airport will increase its total capacity to 30 million passengers/year, more than doubling its present number. There will be 67 passenger bridges in total, including the 18 already in use. In addition, capacity for vehicle parking will double.

Liebherr Chile has already erected seven 250 EC-B 12 Litronic, four 150 EC-B 8 Litronic cranes and one 280 EC-H 16 Litronic crane. Six cranes from the Chilean dealer Maquinarias Cruz del Sur are also in use: one 280 EC-H 12 Litronic, two 200 EC-H 10 Litronic and three 90 EC-B cranes. The 18 tower cranes have a jib length of 45-60m; they have been working on the construction site, since the end of 2016, with much  of the work now completed.

More Liebherr tower cranes will follow for the construction of the multi-storey car parks; three 110 EC-B 6 and two 154 EC-H cranes.

The location of a Liebherr branch in Santiago was a key factor for the Vinci-Astaldi consortium. In addition to the Liebherr tower cranes from its own fleet, the dealer Maquinarias Cruz del Sur is providing assembly, service and crane operators for all cranes.

The Liebherr Tower Cranes Solutions project department has provided the consortium with guidance for planning the most economical coverage of the construction site.

In airport construction, the permitted crane heights are very limited. In order to work with several cranes in tight spaces, the technicians mounted a Flat-Top 250 EC-B 12 Litronic crane on rails to build one of the terminals. This allows the crane to cover a large area, while it can also be moved to a position where it can slew freely. As a safety measure, all cranes are equipped with an anti-collision system from French manufacturer AMCS.

For more information on companies in this article

Related Content

  • Manitowoc open day on Réunion Island
    May 10, 2018
    Manitowoc cranes were on show recently at the firm’s dealer open days event on Réunion Island
  • Towers of power: California’s Gerald Desmond Bridge Replacement
    May 8, 2019
    Challenging ground conditions meant a design rethink - and some engineering firsts - for California’s Gerald Desmond Bridge Replacement Project* The Port of Long Beach on Terminal Island south of Los Angeles is the second-busiest container port in the US. It handles around 15% of all imported goods, much of it with Asia. As the Port of Long Beach was growing in importance over the past half century, the 51-year-old Gerald Desmond Bridge has faithfully been delivering thousands of daily commuters to wo
  • Istanbul’s new airport benefits from Wirtgen Group machines
    November 22, 2017
    Construction of Istanbul’s new airport facility is benefiting from the use of a large fleet of machines from the Wirtgen Group. When it is complete, this will be the world’s largest airport and will be able to handle 150-200 million passengers/year as well as 6 million tonnes of freight/year. This will make the facility substantially larger than the world’s current largest airport, the Hartsfield-Jackson Atlanta International Airport, which handles around 105 million passengers/year.
  • The Mersey Gateway bridge project continues on schedule
    October 18, 2016
    Work continues on the 2.3km Mersey Gateway signature bridge project close to Liverpool in the UK. David Arminas reports on some of the construction highlights. Under construction is a cable-stayed structure with three towers that will span the Mersey River’s expansive mud flats between the towns of Runcorn and Widnes near Liverpool. Including the approach viaducts on each side, it will be 2.3km long with a river span of 1km. The main bridge deck will be reinforced concrete. The 80m-high central tower will b