Skip to main content

Junction construction

Two Liebherr mobile cranes and four Atlas Copco compressors are playing an important role in upgrades to a highway in Brazilian city São Paolo.
February 7, 2012 Read time: 3 mins
Two Liebherr cranes and four Atlas Copco compressors are carrying out important duties on a road upgrade project in Brazil
Two 718 Liebherr mobile cranes and four 161 Atlas Copco compressors are playing an important role in upgrades to a highway in Brazilian city São Paolo. 1564 CCR Autoban is using the Liebherr all-terrain cranes to lift the concrete-and-steel beams for a new cloverleaf junction being built on the Anhangüera Highway, one of the city's main road links. The machines were supplied by heavy-lift specialist IV Guindastes, which is one of Brazil's largest crane hire firms. The cranes are an LTM1500-8.1 with a maximum lift of 500tonnes and an LTM1220-5.2 with a lifting capacity of 242tonnes.

The Anhangüera Highway is being upgraded along a 6km stretch by highway concessionaire CCR Autoban, working under ARTESP (Agencia de Transporte do Estado de Sao Paulo). The project calls for the construction of three new clover interchanges, the upgrading of two others, and the construction of 14km of slip roads. Also included is the installation of five pedestrian bridges, and ancillary works.

The two Liebherr cranes are working on an interchange that will ease the flow of traffic where Mutinga Avenue, one of the main thoroughfares of the Pirituba and Santo Domingo districts in São Paulo, is bisected by the Anhangüera Highway.
The cranes are handling loads of up to 80tonnes, for the largest of the beams, with smaller beams weighing around 60tonnes. The cranes arrived on site in June 2010 and are being employed on a night time service since the roads are closed throughout lifting operations.

Meanwhile the four Atlas Copco compressors are being used by 1563 Serveng Civilsan to power equipment and clean machines being used on the highway.

The oil-injected, rotary screw, portable compressors are owned by sub-contractor Serveng Civilsan and are being used for multiple tasks including sand-blasting and powering small tools. An XAS77 compressor is being used at the base of the new interchange, while another XAS77 is located at Serveng Civilsan's workshop at the start of the section. Meanwhile two XAS137 units are located in the centre of the project, beside the main highway, where they are working side-by-side.

ARTESP is investing a total of US$150 million to upgrade the main junctions on Anhangüera Highway. This route is one of the most important highways in the State of Sao Paulo, and one of the busiest roads in Brazil, as it connects the state capital to the Campinas region, one of the economic hubs of the country. Mutinga Avenue is one of the main avenues of the neighbourhoods of Pirituba and Santo Domingo in São Paulo. The roads starts at Pirituba railway station and apart from being cut by the Anhanguera Highway, ends at Ribeirão Vermelho, on the border with the city of Osasco. CCR Autoban has the highway concession under contract to the São Paulo government, which is scheduled to end in 2026.

For more information on companies in this article

Related Content

  • Tunnelling with Atlas Copco's HPT
    February 6, 2012
    Atlas Copco claims that its high precision tunnelling (HPT) system will offer greater productivity and reduced costs in drill and blast tunnelling operations. The HPT system is a package with five options for use on drill rigs and other types of construction equipment. Advanced PC-based software allows a worksite office to provide operational support to Atlas Copco rigs equipped with the Rig Control System (RCS). The Tunnel Manager system can help plan, store and evaluate data for the drilling process. This
  • Road and tunnel project eases Stockholm congestion
    February 23, 2012
    Part of the E20 European highway, the Norra länken aims to make a valuable contribution to easing congestion in central Stockholm. The construction of Norra länken is one of the biggest and most important road and tunnel projects being undertaken in Sweden, certainly in terms of scope and budget. It will be a link in the peripheral route around the Stockholm inner city area and be part of the E20 European Highway.
  • Tough truck linings for Brazil quarry
    April 16, 2018
    In Brazil the Julio and Julio Group is now using Metso's Haul Truck Solution to reduce the operating costs and improve the performance of its truck fleet in the São Domingos quarry in Sorocaba. Over the long term, this investment is estimated to reduce operating costs by 30%. The São Domingos quarry has a capacity of about 1,200,000tonnes/year of crushed stone and covers an area of 1,500,000m² in Sorocaba, São Paulo state. Julio and Julio was looking for a hauling solution that meets current market specif
  • Volvo-powered Man Engine to tower of Hillhead in June
    April 3, 2018
    The UK’s largest mechanical puppet, the 11m-tall Man Engine, will make a special appearance at this year’s Hillhead construction equipment exhibition. Man Engine is powered by a Volvo L220 wheeled loader on loan from Volvo CE in the UK. It will be towering over the showgrounds during the exhibition at the Hillhead Quarry near the northern English town of Buxton June 26-28. The Man Engine – a miner wearing a miner’s hat – was created to celebrate the history of mining in the south-east English county o