Skip to main content

Eliminating leaks on Prague bridge

Stirling Lloyd's Eliminator waterproofing system, found on the decks of many of the world best known highway bridges, is being used in a €8.7 million refurbishment project on the famous 650-year-old Charles Bridge in the Czech capital Prague. Work on the tourist attraction includes repairs to the upper bridge section, replacement of the old concrete deck, installation of the new waterproofing system, replacing stones in sills where required, new drainage and repair to the structures pillars. It will repair
July 17, 2012 Read time: 2 mins
2314 Stirling Lloyd's Eliminator waterproofing system, found on the decks of many of the world best known highway bridges, is being used in a €8.7 million refurbishment project on the famous 650-year-old Charles Bridge in the Czech capital Prague.

Work on the tourist attraction includes repairs to the upper bridge section, replacement of the old concrete deck, installation of the new waterproofing system, replacing stones in sills where required, new drainage and repair to the structures pillars. It will repair damage caused by the weather, wear from many thousands of tourists and the floods of 2002.

The Eliminator system, which will replace the existing leaking traditional waterproofing system, is based on advanced methyl methacrylate (MMA) technology that enables it to be applied in a wide range of temperatures and climatic conditions. Stirling Lloyd's authorised contractor HELIFIX arrived on site in December 2007, and refurbishment of the 4,500m2, 516m long deck is programmed to be completed by December.

The old concrete deck and previous waterproofing system is being removed and replaced by a new concrete deck. It is then primed with Stirling Lloyd's MMA based primer, PAR1 primer, that seals the concrete, and the Eliminator waterproofing membrane is spray applied in two separate coats. Stirling Lloyd's Metaset structural adhesive is applied, and while still tacky, the drainage geotextile is placed, followed by 100mm of concrete and the original numbered paving stones.

For more information on companies in this article

Related Content

  • Puddle problem solved
    February 13, 2012
    A slip resistant, waterproof surface has solved the puddle problem on a footbridge in the UK. The local council was seeking a solution to the problem of water accumulation on the heavily used Angmering footbridge which extends over the A259. Contractor May Gurney, approached Gaysha Specialist Surfaces, which is a specialist in innovative resin paving products, to undertake the resurfacing work. Gaysha Specialist Surfaces laid 190m2 of Tripave, a durable rapid cure surfacing system based on methyl methacryla
  • Innovations in concrete paving technology
    March 16, 2012
    Paving with concrete offers a strong and long life base for a roadway, with manufacturers continuing to develop technologies – Mike Woof reports. Innovation comes fast in the concrete paving market with a number of specialist suppliers offering an array of solutions to meet the needs of slipforming contractors. These machines can be used for a range of applications from large-scale airport runway or highway construction duties, tunnel jobs, bridge decks, barriers, traffic islands and kerbs. Because the app
  • Concrete solution for Georgia's Silk Road section
    February 20, 2012
    The E60 highway project forms a key route of strategic importance for both Europe and Asia. This long road from the port of Brest in France, crosses Germany, Austria, Hungary, Romania, Switzerland, Georgia, Azerbaijan, Turkmenistan, Tajikistan, Uzbekistan, and ends at Irkeshtam in Kyrgzstan.
  • Effective crushing and screening key to quality
    February 22, 2012
    Efficient crushing and screening processes help produce quality products, Mike Woof reports. Having an efficient crushing and screening operation is crucial to the cost-effectiveness of a quarry as well as providing the best quality product. The crushing circuit is a key component in any quarry with the right selection of equipment as well as effective maintenance important factors in optimising performance.