Skip to main content

Eliminating leaks on Prague bridge

Stirling Lloyd's Eliminator waterproofing system, found on the decks of many of the world best known highway bridges, is being used in a €8.7 million refurbishment project on the famous 650-year-old Charles Bridge in the Czech capital Prague. Work on the tourist attraction includes repairs to the upper bridge section, replacement of the old concrete deck, installation of the new waterproofing system, replacing stones in sills where required, new drainage and repair to the structures pillars. It will repair
July 17, 2012 Read time: 2 mins
2314 Stirling Lloyd's Eliminator waterproofing system, found on the decks of many of the world best known highway bridges, is being used in a €8.7 million refurbishment project on the famous 650-year-old Charles Bridge in the Czech capital Prague.

Work on the tourist attraction includes repairs to the upper bridge section, replacement of the old concrete deck, installation of the new waterproofing system, replacing stones in sills where required, new drainage and repair to the structures pillars. It will repair damage caused by the weather, wear from many thousands of tourists and the floods of 2002.

The Eliminator system, which will replace the existing leaking traditional waterproofing system, is based on advanced methyl methacrylate (MMA) technology that enables it to be applied in a wide range of temperatures and climatic conditions. Stirling Lloyd's authorised contractor HELIFIX arrived on site in December 2007, and refurbishment of the 4,500m2, 516m long deck is programmed to be completed by December.

The old concrete deck and previous waterproofing system is being removed and replaced by a new concrete deck. It is then primed with Stirling Lloyd's MMA based primer, PAR1 primer, that seals the concrete, and the Eliminator waterproofing membrane is spray applied in two separate coats. Stirling Lloyd's Metaset structural adhesive is applied, and while still tacky, the drainage geotextile is placed, followed by 100mm of concrete and the original numbered paving stones.

For more information on companies in this article

Related Content

  • Qatar’s Lusail tunnel project
    March 24, 2017
    Qatar’s Lusail Tunnel is forming part of a new US$30 billion integrated transportation system The tunnel, and troughs to be constructed from Spring 2017, will carry both road traffic and light rail. Stirling Lloyd’s Integrating system has been used to waterproof 77,416m2 of the new tunnel. The cut and cover tunnel will open in Spring 2017 and will ensure easy access to the new Lusail City Development from the heart of Doha and will be a vital transport link for the planned 2022 FIFA World Cup tourname
  • Flexible resin speeds asphalt surface repair
    March 15, 2012
    Stirling Lloyd is using innovative micro-trenching technology during a £1.1million (US$1.72million) project to improve Internet infrastructure on the Shetland Isles off the north-east Scottish coast.
  • Flexible resin speeds asphalt surface repair
    April 4, 2012
    Stirling Lloyd is using innovative micro-trenching technology during a £1.1million (US$1.72million) project to improve Internet infrastructure on the Shetland Isles off the north-east Scottish coast. Fibre optic cables were fitted in a micro-trench 20mm wide and 150mm deep following road excavation, before the company’s Safetrack Crack Infill (SCI) system was used to reinstate the road surface for less closure delays.
  • Tailor made pavement preservation solutions
    March 16, 2012
    VSS Macropaver is well known worldwide for offering customers individualised solutions for their emulsion blending needs.