Efficient sheet piling for motorway projects

A UK-based steel sheet-piling contractor, Sheet Piling, is now using a TM 12/15 LR rig from the German ABI Group for motorway projects such as the widening of existing earthworks. This is said to be the world’s first long-reach telescopic leader rig, which is claimed will revolutionise sheet piling operations. The highly advanced vibratory installation rig features a maximum horizontal reach of 8.1m, measured from the centre of its cab’s body to the pile-driving position. This is said to be 3m further t
January 11, 2019 Read time: 2 mins
A UK-based steel sheet-piling contractor, Sheet Piling, is now using a TM 12/15 LR rig from the German ABI Group for motorway projects such as the widening of existing earthworks.
A UK-based steel sheet-piling contractor, Sheet Piling, is now using a TM 12/15 LR rig from the German ABI Group for motorway projects such as the widening of existing earthworks. This is said to be the world’s first long-reach telescopic leader rig, which is claimed will revolutionise sheet piling operations.


The highly advanced vibratory installation rig features a maximum horizontal reach of 8.1m, measured from the centre of its cab’s body to the pile-driving position. This is said to be 3m further than any other rig currently available.

Operating with a rig with this extended reach provides a contractor with distinct advantages. Currently, the widening phase of SMART motorway upgrades typically requires two weeks of enabling works and platform construction, so as to support a rig with the standard 5m reach.  With the new TM 12/15 LR, no such preparation works are required, as the 8m-reach rig can stand on the existing carriageway and drive the piles where required.

This speeds up a widening project and also reduces overall cost. Predicted savings are between £40,000 and £60,000 for a project within which a typical 100m sheet-pile wall is being installed.

Despite the extra reach capacity of the rig, the design does not compromise other capabilities. The long-reach telescopic leader rig’s vertical reach is 3.9m and it offers a maximum driven or extracted pile length of 16m.

The rig also has a powerful MRZV 20VV vibratory hammer and MDBA 4000 auger attachment, with power from a Euro Stage IV emissions engine. It provides the contractor with an extraction force of 175kN and a crowd force of 100kN. The weight of the extended arm is balanced by an additional 3tonne counterweight, whilst a heavy-duty hydraulically extendable undercarriage has a 4.2m overall track width, which reduces ground-bearing pressures.

Related Content

  • Liebherr piling machines on Vietnam road project
    March 7, 2018
    Crucial piling work for the elevated approach to a bridge at Haiphong in Vietnam has been carried out by a Liebherr rig Highly productive and reliable, the Liebherr LB36-410 rig has been used to complete piles for the new bridge link. The machine has had success drilling through waterlogged ground and has helped to keep the project on schedule. Vietnamese ground engineering and foundations specialist contractor, Dua Fat Foundation Joint Stock Company has been using the Liebherr LB 36-410 rotary drillin
  • Piling rig control system from Trimble 
    October 27, 2022
    Trimble is offering machine control options for piling and drilling machines from ABI Maschinenfabrik und Vertriebsgesellschaft as well as Junttan.
  • Emergent markets key for formwork sector growth
    May 21, 2014
    Central and south-east Europe are hotbeds for new highway infrastructure projects utilising cutting-edge formwork solutions, while a number of leading formwork manufacturers are also looking at emergent markets for growth. Guy Woodford reports Travelling between Hungary’s capital Budapest and Southern Dalmatia now takes less time thanks to the Pan-European Corridor Vc – European route 73. Numerous tunnels and bridges are erected along the 397km stretch of the European route 73 through Bosnia owing to the
  • Quick to install embankment support
    February 17, 2012