Skip to main content

Doka handles Austria tunnel upgrade

A key section of the busy A12 route in Austria’s Tyrol area has been refurbished with help from formwork specialist Doka. The company devised a formwork traveller featuring steel panels so as to help build a new inner shell for the twin-tube Senftenberg Gallery tunnel. The job involved 36 pouring sections for work on the first tube followed by a break to accommodate winter tourist travel. After some minor modifications the same formwork traveller was then re-used for another pouring a further 36 sections on
January 4, 2017 Read time: 2 mins
Doka’s formwork has helped revamp a twin tube tunnel on Austria’s A12 highway
A key section of the busy A12 route in Austria’s Tyrol area has been refurbished with help from formwork specialist 203 Doka. The company devised a formwork traveller featuring steel panels so as to help build a new inner shell for the twin-tube Senftenberg Gallery tunnel. The job involved 36 pouring sections for work on the first tube followed by a break to accommodate winter tourist travel. After some minor modifications the same formwork traveller was then re-used for another pouring a further 36 sections on the second tube.

The job involved the renovation of the twin-tube highway tunnel with an existing centre wall and V-shaped columns. The 360m long tunnel sections are 10m wide by 6.5m high and the work was carried out by contractor 945 Strabag.

Formwork sheet made of steel panels was employed as this ensured a long lifespan and a high-grade concrete finish, allowing the pouring of 72 sections without replacing the panels. The formwork traveller met key requirements for the work and was pre-assembled by Doka, cutting costs for the contractor.

For more information on companies in this article

Related Content

  • Stockholm’s new bypass
    March 8, 2021
    Tunnels make up 18km of the 21km of the Swedish capital’s E4 Bypass mega-project. It will have taken 15 years from start to opening in 2030, if all goes well
  • Challenging viaduct construction
    March 2, 2012
    TRAFFIC VOLUMES on Gran Canaria, the third largest of the Canary Islands, have been swelling rapidly in recent years, not least because of the boom in tourism. Among the routes most affected is the 32km long northern motorway GC-2 between Las Palmas and Agaëte, which has reached the limits of its capacity.
  • Improving a key route through Florida
    November 9, 2015
    Upgrading a key route through Florida – novel construction techniques are helping widen a road in difficult geological conditions – Lucio Garofalo reports. A major road widening project underway in Florida is due for completion soon. The work will improve an important section of road, reducing congestion at peak period and cutting travel times for drivers. The US 331/SR83 highway runs for some 79km and provides an important link in Florida’s Panhandle area, as it connects with Route 98.
  • Upgrade for Scottish road
    February 17, 2012
    Work is progressing on a £320 million (e385 million) project to upgrade a busy 18km stretch of the main A80 Glasgow-Stirling road in Scotland to motorway standard. The project, between the villages of Stepps and Haggs, is part of a massive infrastructure investment in Scotland's transport network, and construction work includes almost 8km of new dual-lane motorway and hard shoulders between