Skip to main content

CIFA’s concrete coastal protection

Machines from CIFA are playing an important role in providing protection during a port expansion job. There is a considerable need for additional sea protection during a major port expansion project in Italy. The port of Civitavecchia is being expanded as part of a programme to boost its capacity and capabilities and develop the facility both for its commercial and tourist operations. However, the work comes with considerable need to improve the protection from the sea, so as to ensure that its roadways
August 19, 2015 Read time: 2 mins
The CIFA machines are playing an important role in supplying concrete for the job
Machines from 2203 CIFA are playing an important role in providing protection during a port expansion job. There is a considerable need for additional sea protection during a major port expansion project in Italy. The port of Civitavecchia is being expanded as part of a programme to boost its capacity and capabilities and develop the facility both for its commercial and tourist operations.

However, the work comes with considerable need to improve the protection from the sea, so as to ensure that its roadways and other infrastructure do not fall victim to any inrush during periods of bad weather.

The client is the Civitavecchia Port Authority of the same name, while the large cell caissons made in reinforced concrete are being carried out by 3869 Grandi Lavori Fincosit and Impresa Pietro Cidonio.

A Cifa K48 concrete pump is carrying out key tasks in casting concrete to make cell caissons. These reinforced concrete structures comprise a bottom slab that serves as the foundations, and an integral shaft, consisting of perimeter walls and internal sections that divide it into an adequate number of cells.

The formwork is made of double metal formwork and a work surface. First, the metal reinforcement for the slab is laid down with a rebar for the external walls and internal partitions for the trunk of the caisson, then the base slab is cast, delimited by special formwork perimeters. When the sliding formwork is lowered, the caisson shaft is built by casting the concrete into the formwork and simultaneously installing the metal warping. After the shaft is cast, the formwork is suspended above the upper mobile frame and raised so as not to hinder the launching of the caisson. Lastly, the box, suitably ballasted, is extracted from the system and towed to the point of temporary storage in flotation, where installation is completed and the prefabricated cover slab is sealed.

For more information on companies in this article

Related Content

  • Superlative formwork’s global appeal
    April 25, 2013
    The latest formwork solutions are enabling some tough bridge-building projects to be delivered in South America and Europe, while the world’s largest construction equipment show is seeing the merits of other cutting-edge formwork. Guy Woodford reports. Taking a road and rail link across one of South America’s largest rivers, together with its swamps and floodplain, calls for a new crossing of superlative dimensions. Two 135.5m pylons for the third bridge across the Orinoco River in Venezuela are taking shap
  • Efficient concrete production in Germany
    January 11, 2019
    A German concrete producer, Thomas Beton, is boosting its operating efficiency by using the latest plants. The firm is now producing high-quality ready-mix for a range of projects in North Germany. Thomas Beton is strengthening its local presence and produces concrete at 26 facilities across the German states of Schleswig-Holstein, Hamburg, Bremen and Lower Saxony. Producing materials closer to operating sites helps lower transportation distances and reduce logistics costs for its clients. When the firm w
  • Kronprinsesse Marys Bro bridges Roskilde Fjord
    January 10, 2019
    A BESIX joint venture is giving the royal treatment to the new Kronprinsesse Marys Bro across Roskilde Fjord, writes David Arminas It was announced in September 2016 that Belgian group BESIX, in a joint venture (RBAI) with Italian firm Rizzani de Eccher and Spanish company Acciona Infraestructuras, had been chosen for the €133 million project. The award, by client Vejdirektoratet (Danish Road Directorate), marked the entry of BESIX into the Scandinavian market. Vejdirektoratet praised the winning bid as
  • Bridges in Sunderland and Poland are being slid into place
    February 6, 2017
    Sunderland sees a bridge slide into place and two bridges inch their way across a Polish highway Slowly but surely, a 2,500 tonne section of a new bridge deck was eased out from the banks of the River Wear near Sunderland in northern England. It now straddles the water, pointing towards the opposite bank which it will eventually reach after another sliding operation likely to take place next year. The project to build the New Wear Crossing is now halfway through with the first half of the steel deck b