Skip to main content

Canadian air

Compressors from Atlas Copco are proving highly useful in highly diverse applications, on a bridge project and a quarry in Canada. Water ingress over 30 years has damaged a road bridge in Quebec City, Canada, deteriorating the concrete and breaking down the rubber expansion joints at both ends of the 150m long structure. City highway authority, Transportes Quebec, awarded local contracting company Inter-Structures the contract to replace the deteriorated concrete and fit new membrane seals. The bridge, clos
February 8, 2012 Read time: 3 mins
Compressors from 161 Atlas Copco are proving highly useful in highly diverse applications, on a bridge project and a quarry in Canada. Water ingress over 30 years has damaged a road bridge in Quebec City, Canada, deteriorating the concrete and breaking down the rubber expansion joints at both ends of the 150m long structure. City highway authority, Transportes Quebec, awarded local contracting company Inter-Structures the contract to replace the deteriorated concrete and fit new membrane seals. The bridge, close to the St Lawrence river and Quebec City, links highway 440 West and the Boulevard de Chutes to provide access to a residential area and the renown Montmorency park and waterfall.

To ensure access to the damaged seals across the full width of the bridge, the contractor has removed more than 300mm x 200mm x 200mm on each of the nine beams at both ends of the bridge and the 200mm thick concrete slab; relying on two Atlas Copco XAS185 air compressors, including a recently delivered unit on rental from Equipment LAV.

On the Inter-Structures project, both XAS 185 portable air compressors are supplying a free air delivery of 89litres/s at 7bars to each provide compressed air for three breakers.

Meanwhile a newly formed Canadian quarry drill and blast contractor, Forexplo, has taken delivery of a second Atlas Copco XRVS 1000 CD6 air compressor.

Formed at the beginning of the year, 2455 Forexplo has established itself as a drill and blast specialist in Canada's Quebec Province. A key factor in meeting the production targets, is the on-demand high pressure air provided by the two Atlas Copco compressors for two large drill rigs. The firm now has drill and blast contracts with Beauval for the quarries in Valleyfield, Ange Gardien, some 55km south of Montreal and Herbertville on Lac St Jean. The XRVS 1000, rated at 25bars, is powered by a 178 Caterpillar C13 diesel and is said to be highly economical on fuel.

The Ange Gardien quarry was acquired by Beauval in in 1981 and has reserves for at least another 25 years, featuring micritic limestone and a black argillaceous slate. The site has three bench levels along the lkm long quarry andis Forexplo are drilling and blasting 8-12m deep bench heights. Depending on Beauval's requirements, Forexplo is typically drilling 56 holes for a blast to provide some 20,000tonnes. Using Atlas Copco standard or Speedbit 140mm bits, Forexplo is drilling up to 30m/h.

For more information on companies in this article

Related Content

  • Road repairs take to the air
    November 29, 2018
    Automated road repairs using 3D printing could save money and reduce disruption, reports Kristina Smith It’s the middle of the night and in the street below a team is busy carrying out repairs to the road surface. But there isn’t a human in sight. A road-repair drone has landed at the site of a crack and a 3D asphalt printer is now busy filling in that crack. A group of traffic cone drones have positioned themselves around the repair location to protect the repair drone and divert traffic around it.
  • Atlas Copco attachments make short work of the A8 Blaubeurer Weg Bridge
    March 21, 2016
    A reinforced concrete bridge over the Autobahn 8 between Merklingen and Nellingen in southern Germany was demolished overnight due in no small part to the efficient, reliable performance of Atlas Copco hydraulic attachments. In addition to demolition grippers, breakers and pulverisers, the demolition team used the HM 2000 hydraulic magnet to demolish structures and sort demolition waste. There is now nothing to stop the widening of the A8 to six lanes or construction of the parallel high-speed Wendlingen
  • Long-lasting surface repairs for Avonmouth Bridge
    July 9, 2012
    Two technologies combined to give a heavily used bridge a new surface that should last for years The Avonmouth Bridge carries the M5 motorway over the River Avon, and is a vital part of the road infrastructure in south-west England, linking the counties of Somerset, Devon and Cornwall to the rest of the country. Completed in 1973, it carries commuters to the city of Bristol, and to South Wales, along with holidaymakers. The 1.4km long steel box girder bridge comprising a 16,000m2 steel decked central span a
  • New concrete surface for Arizona freeway
    November 15, 2013
    In Tucson, Arizona, contractor McNeil brothers is using a two-track GOMACO concrete slipformer on a 3.2km stretch of highway. This project is for the Arizona Department of Transportation (ADOT) and involves widening Interstate 10 to four lanes of traffic in each direction between Ruthrauff Road and Prince Road in Tucson. This new stretch was needed to better handle increasing traffic demands in the city and includes rebuilt entrance and exit ramps to improve access to the city.