Skip to main content

Bridge access addition

Terex has acquired Hydra Platforms, a specialist manufacturer of access equipment designed for bridge maintenance and repair. This business is being brought into the group alongside its Bid-Well brand. The move gives Terex Roadbuilding a business that concentrates in bridge maintenance with the addition of the under-bridge access equipment to the existing range of bridge pavers, work bridges and texture/curing machines. The Hydra Platforms range includes seven hydraulically operated, self-contained units an
July 30, 2012 Read time: 2 mins
Terex is broadening its range with the addition of Hydra Platforms, a specialist manufacturer of underbridge inspection and maintenance equipment
1222 Terex has acquired Hydra Platforms, a specialist manufacturer of access equipment designed for bridge maintenance and repair. This business is being brought into the group alongside its Bid-Well brand. The move gives 3956 Terex Roadbuilding a business that concentrates in bridge maintenance with the addition of the under-bridge access equipment to the existing range of bridge pavers, work bridges and texture/curing machines.

The Hydra Platforms range includes seven hydraulically operated, self-contained units and there are two trailer-mounted models, the HP32 and HP35, with platform lengths 9.8m and 10.7m. The line-up also includes five truck-mounted units; the HPT43, HPT52, HPT55, HPT60 and HPT66 with platform lengths of 13.1-20.0m. These inspection platforms are equipped with the firm's patented, fully adjustable tower separation system. This features hydraulically adjustable cross linking arms that allow operators to adjust and move the outside tower toward the bridge fascia or extend it over obstacles without having to reposition the truck or trailer. This system also uses a crossover access platform with rails, allowing operators to safely access the unit's tower and under-bridge platform. The truck units can work from a single lane and can be moved from the platform while it is deployed by the operator.

For more information on companies in this article

Related Content

  • The concrete option
    July 31, 2012
    Concrete highway construction techniques and technology continues to evolve. Mike Woof reports The recent increases in oil costs are having a knock-on effect for the road construction sector, as asphalt prices have increased noticeably and faster than those for concrete. This has spurred renewed discussion over which construction technique now offers the best long term solution for road building. The debate between those in favour of concrete and those preferring asphalt for highway construction has been on
  • Advances in concrete paving technology will increase efficiency
    July 1, 2014
    New developments in concrete paving will increase working efficiency for contractors - Mike Woof writes The concrete paving market is a fiercely competitive segment of the off-highway construction machinery business. Although there are only a few key players in this niche market, the firms are constantly developing new systems, equipment and methods in a bid to help improve working efficiencies for contractors working in the sector. It is of note that the majority of the key players in the concrete pavin
  • Asphalt plant technology meets market needs
    February 16, 2012
    Plants for mixing asphalt are becoming more sophisticated than ever, while users are looking for ecological and technological benefits. Patrick Smith reports. When the Adige Bitumi Group decided to renew its old M 260 plant it chose to collaborate with Marini for the design and development of a plant with production of 280-300tonnes/hour.
  • Doka delivers cantilevering for super-slim piers at Lahntal Bridge
    October 21, 2016
    Doka’s formwork expertise is currently in demand during the construction of one of the busiest motorway viaducts in Germany. The 400m six-lane Lahntal Bridge in Limburg dates from the early 1960s. Every day about 100,000 vehicles cross the bridge that spans the valley of the River Lahn. But traffic loads have increased sharply, so a new bridge is being built sited just a few metres west of the old viaduct. The new Lahntal viaduct will measure a massive 43.5m in width, enabling eight lanes plus hard shoul