Skip to main content

Breakers building underground carpark in Qatar

A fleet of Rammer breakers is being used to help build a new underground car park in Qatar The underground car park will be for a dentistry and dermatology clinic in the capital, Doha. Hydraulic hammers being mentioned at the same time as a dental surgery is often associated with pain, discomfort and general unpleasantness. This is not the case in Doha, the capital of Qatar, as Rammer hammers are being used to spearhead the creation of an underground car park at a dentistry and dermatology clinic.
June 20, 2016 Read time: 2 mins
The Rammer breakers are meeting productivity targets
A fleet of 5076 Rammer breakers is being used to help build a new underground car park in Qatar

The underground car park will be for a dentistry and dermatology clinic in the capital, Doha.

Hydraulic hammers being mentioned at the same time as a dental surgery is often associated with pain, discomfort and general unpleasantness. This is not the case in Doha, the capital of Qatar, as Rammer hammers are being used to spearhead the creation of an underground car park at a dentistry and dermatology clinic.

The principle contractor on the project, 5487 Roadbridge, is using a fleet of Rammer hammers that range from a pair of 3288 models right up to a 7013. The latter being the largest unit in the Rammer range. Part of a US$10 million contract, the project requires the removal of around 350,000m3 of medium and hard limestone to create a car park space that is 200m long by 150m wide and 25m deep.

The six-month contract is being carried out by Roadbridge. Heavy breaking is carried out by the 6.2tonne Rammer 7013 which is mounted on a Volvo EC700 excavator. The firm also has a 2300 Komatsu PC600 and a 178 Caterpillar 345, each carrying a 3.9tonne Rammer 5011.   

Elsewhere on the site, a pair of JCB JS360 excavators are being used for out-breaking work using two Rammer 4099 hammers, each of which weigh in at 2.8tonnes. Lighter breaking work is charged to two more JCB excavators, both JS260 units, that are each equipped with a 2.04tonne Rammer 3288 breaker.

Despite the high temperatures, dusty conditions and long 10-hour shifts, the Rammer units have been reliable and Roadbridge reckons it will meet its target of an average production rate of 3,000m3/day throughout the work.

For more information on companies in this article

Related Content

  • Rare Indian red granite extracted from village quarries
    June 25, 2013
    Rare Indian red granite is being extracted from four granite quarries across 24hectares of land in the south Indian villages of Purthagere and Kadur According to legend, Ilkal granite (also known as Cat’s Eye granite) was first discovered 2,000 years ago, but remained a little known rarity for two millennia. This all changed in 1983 when rich deposits were discovered in a small corner of south-west India, allowing Ilkal granite to be exploited for its beauty and decorative worth.
  • Building a car dealership with machine control
    May 21, 2018
    Canadian contractor MB Ford Construction recently built a massive car sales facility in Canada. Meanwhile the highly specialised site preparation job was sub-contracted to another local firm, Rabb Construction. The new Dilawri Auto Mall was a sizeable, heavy civil project on a 6ha site. Rabb needed to level and grade the site for the four car dealer elevated building pads and their surrounding inventory lots and customer parking. The contract included excavating three storm water runoff retention ponds, wh
  • Excavator advances for the earthmoving sector
    May 26, 2021
    Manufacturers are introducing an array of new excavators and improved models
  • Korean company carrying out Qatar construction contract
    September 9, 2016
    A South Korean contractor is to carry out construction work on a key Qatar project. The contract for the project was awarded by Qatar’s public works authority Ashghal to Daewoo Engineering & Construction (Daewoo E&C).