Skip to main content

Air helps build bridge

Chinese contractor Shanghai Sheng Xin Construction Co is using an Atlas Copco XAS 67 compressor on a new road bridge project in Shanghai. The new bridge is at Dan Ba Road, one of the main arteries in this older part of the city.
February 13, 2012 Read time: 1 min
An Atlas Copco oil-injected rotary screw compressor is working on piling for the bridge, which will span a river in Shanghai's Pu Tuo district
Chinese contractor Shanghai Sheng Xin Construction Co is using an 161 Atlas Copco XAS 67 compressor on a new road bridge project in Shanghai. The new bridge is at Dan Ba Road, one of the main arteries in this older part of the city. The contractor is due to complete the 1km of bridge and approach roads in March of this year. The piling being used for the bridge is steel reinforced concrete as the ground here is soft and requires substantial support. After the piles are driven into the ground, a remainder remains above the surface and the bridge superstructure is mounted on top. Pneumatic hammers remove the concrete and expose the steel reinforcement, with air from the compressor then being used to blast away remaining fragments. There are around 100 piles being driven in total, with 50 on either side of the river.

For more information on companies in this article

Related Content

  • Sandvik drilling rigs boost production
    July 9, 2012
    The drill and blast contractor Technical Drilling and Blasting in the United Arab Emirates (UAE) is standardising on Sandvik rock tools for its fleet of drill rigs. The firm operates across Fujeirah, providing quality gabbro aggregates for construction projects in Dubai and Abu Dhabi. Recognised as one of the worlds hardest rocks, gabbro features a typical density in excess of 3tonnes/m, a crushing factor of 10 and a 61% silica content and demand remains strong for this quality construction material. Every
  • Formwork innovations help bridge building
    July 7, 2015
    A series of formwork developments are helping with challenging bridge construction projects around the world - Mike Woof writes In the Polish city of Krakow, a cost-effective cable stayed bridge is being constructed using a balanced cantilever technique. The current expansion of the Krakow metropolitan railway network (KST) requires the building of a crossing of the Krakow-Plaszow railway junction. Ensuring that daily rail operations remained unaffected during the construction of the 252m long crossing w
  • Washington DC’s historic bridge replacement project
    June 11, 2019
    The project to replace a historic bridge in US capital Washington DC is providing major challenges for its builders - Mike Woof writes
  • Atlas Copco attachments make short work of the A8 Blaubeurer Weg Bridge
    March 21, 2016
    A reinforced concrete bridge over the Autobahn 8 between Merklingen and Nellingen in southern Germany was demolished overnight due in no small part to the efficient, reliable performance of Atlas Copco hydraulic attachments. In addition to demolition grippers, breakers and pulverisers, the demolition team used the HM 2000 hydraulic magnet to demolish structures and sort demolition waste. There is now nothing to stop the widening of the A8 to six lanes or construction of the parallel high-speed Wendlingen