Skip to main content

Acrow lends critical support for the Cradock Bridge renovation

International bridge engineering and supply company Acrow recently installed a modular steel structure to maintain traffic flow during renovation of the historic Cradock Bridge in the US The bridge spanning the Mystic River in Medford, a suburb of Boston, Massachusetts, was built in 1637, then rebuilt in 1880 and again rehabilitated in 1934. It was determined to be structurally deficient several years ago - one of many of state-owned bridges - and was put into the state’s Accelerated Bridge Program. W
October 28, 2016 Read time: 2 mins
Acrow bridge solution for the Cradock Bridge renovation
International bridge engineering and supply company Acrow recently installed a modular steel structure to maintain traffic flow during renovation of the historic Cradock Bridge in the US

The bridge spanning the Mystic River in Medford, a suburb of Boston, Massachusetts, was built in 1637, then rebuilt in 1880 and again rehabilitated in 1934. It was determined to be structurally deficient several years ago - one of many of state-owned bridges - and was put into the state’s Accelerated Bridge Program.

Work on the stone arch bridge is to include demolition and rehabilitation of three concrete piers underneath the structure and installation of renewed stone archways, upgraded utilities, new pavement and sidewalks.

Remnants of an abandoned dam structure will be renovated to restore full flow of the river. It is anticipated that the project will be completed in November 2019.

Acrow’s two-lane detour structure is 41m at centre-line with a width of almost 9.2m.

Because two of the original bridge’s four lanes are closed during the rehabilitation, it was critical to add additional capacity to handle daily traffic in excess of 16,000 vehicles, including almost 300 public transit buses.

Acrow’s bridge solution was purchased by MassDOT for reuse after the completion of the Cradock Bridge job. Design engineer for the project is 1397 AECOM and the contractor is R. Zoppo, based in Stoughton in Massachusetts.

“The growing use of our components for planned repair and rehabilitation work proves the value of Acrow to deliver a safe product and keep state DOTs and contractors on time and on budget,” said Bill Killeen, chief executive of Acrow Bridge.

For more information on companies in this article

Related Content

  • Mexico: underwater tunnel in Latin America
    May 8, 2015
    Mexico will benefit from an important new underwater tunnel - Mauro Nogarin writes. The city of Coatzacoalcos is located at the mouth of the river of the same name, in the Gulf of Mexico, 302km from the city of Salina Cruz, Oaxaca, in the east end of trans-isthmian corridor and at the southern end of Veracruz State. The city is seeing a key development as currently construction is 85% completed on the first immersed tube, underwater tunnel in Latin America. The reasons why experts chose this type of tunne
  • Innovations in formwork aid project completion
    February 14, 2012
    Innovative formwork solutions are helping to get projects completed on or before time, meaning savings in time and money as Patrick smith reports. The use of flexible, modular formwork to create innovative structures out of concrete is helping to increase productivity and thus drive down completion time and costs.
  • Bridge engineering worldwide
    July 1, 2013
    Guy Woodford looks at vital bridge construction, repair and inspection projects in China, Europe, North America and Australia The Heron Road Bridge in Ottawa, Ontario in Canada is a vital link within the City’s transport network, as it crosses the Rideau River, which divides the east and west parts of the City. Constructed in 1966-1967, the Heron Road Bridge is approximately 275m long and includes six lanes.
  • Metrostav/Strabag win Edvard Benes deal
    November 23, 2023
    The €22 million renovation on the bridge over the Elbe in the Czech Republic will start in 2025.