Skip to main content

Acrow lends critical support for the Cradock Bridge renovation

International bridge engineering and supply company Acrow recently installed a modular steel structure to maintain traffic flow during renovation of the historic Cradock Bridge in the US The bridge spanning the Mystic River in Medford, a suburb of Boston, Massachusetts, was built in 1637, then rebuilt in 1880 and again rehabilitated in 1934. It was determined to be structurally deficient several years ago - one of many of state-owned bridges - and was put into the state’s Accelerated Bridge Program. W
October 28, 2016 Read time: 2 mins
Acrow bridge solution for the Cradock Bridge renovation
International bridge engineering and supply company Acrow recently installed a modular steel structure to maintain traffic flow during renovation of the historic Cradock Bridge in the US

The bridge spanning the Mystic River in Medford, a suburb of Boston, Massachusetts, was built in 1637, then rebuilt in 1880 and again rehabilitated in 1934. It was determined to be structurally deficient several years ago - one of many of state-owned bridges - and was put into the state’s Accelerated Bridge Program.

Work on the stone arch bridge is to include demolition and rehabilitation of three concrete piers underneath the structure and installation of renewed stone archways, upgraded utilities, new pavement and sidewalks.

Remnants of an abandoned dam structure will be renovated to restore full flow of the river. It is anticipated that the project will be completed in November 2019.

Acrow’s two-lane detour structure is 41m at centre-line with a width of almost 9.2m.

Because two of the original bridge’s four lanes are closed during the rehabilitation, it was critical to add additional capacity to handle daily traffic in excess of 16,000 vehicles, including almost 300 public transit buses.

Acrow’s bridge solution was purchased by MassDOT for reuse after the completion of the Cradock Bridge job. Design engineer for the project is 1397 AECOM and the contractor is R. Zoppo, based in Stoughton in Massachusetts.

“The growing use of our components for planned repair and rehabilitation work proves the value of Acrow to deliver a safe product and keep state DOTs and contractors on time and on budget,” said Bill Killeen, chief executive of Acrow Bridge.

For more information on companies in this article

Related Content

  • Gordie Howe Bridge on schedule for 2024
    June 19, 2020
    Slowdowns over COVID but time to regain momentum, says WDBA.
  • Terex cranes in a tight spot in Michigan
    February 6, 2017
    Terex cranes have been involved in a multiple bridge repair project in the US More than 96,000 vehicles per day travel a stretch of I-96, including its 52-year-old bridges. The Michigan Department of Transportation is in the midst of a two-year US$77 million project to repair bridges and relieve increasing congestion along Interstate 96 at the U.S. Highway 23 interchange in Livingston County. Toebe Construction along with joint venture partner Kamminga & Roodvoets are bringing in a lot of lifting powe
  • Upgrade for Medieval bridge
    February 29, 2012
    One of the most demanding and challenging impressed current cathodic protection (ICCP) projects ever undertaken by specialist main contractor Concrete Repairs Ltd (CRL) is being carried out on Bideford Longbridge in County Devon, UK. The 24-span medieval masonry arch bridge spans 190m over the tidal estuary of the River Torridge.
  • US DOTs in critical funding battle
    February 9, 2012
    In the US, state DOTs are preparing for the upcoming reauthorisation battle in a tough economic and political climate. Set to expire by the end of the year, the bill is a critical funding source for many transportation projects in the US. However transportation officials in the US are facing a tough battle as the political and economic climate has changed considerably since the last reauthorisation was passed, shortly after President Obama's inauguration in January 2009. Since then, the recession has contin