Skip to main content

Zambian bridge replacement programme

A bridge replacement programme in Zambia is connecting communities.
By MJ Woof March 9, 2020 Read time: 2 mins
Training has been carried out by Acrow Bridge in Zambia for local personnel on the modular bridge nits - image © courtesy of Acrow Bridge

Zambia is benefiting from a programme to install bridges and connect rural communities. The country has bought over 130 modular steel bridges measuring from 12m in length to more than 100m-long from Acrow Bridge.

The bridges include single- and multi-span span structures of one- and two-lane widths. And Acrow Bridge is providing training to Zambian engineers, technicians and contractors in assembly, installation and maintenance of the bridges, which were recently delivered to Zambia’s Road Development Agency.

These bridges are being installed where such links are particularly critical and will contribute to the integration of remote rural communities into the broader domestic and regional economy.

Through its financed Comprehensive Bridge Development Program model, Acrow has worked on a number of large infrastructure development projects in Africa, including the supply of more than 150 bridges to the Government of Angola, 100 bridges to the Department of Feeder Roads in Ghana, and 44 bridges to the Government of Cameroon.
 
Acrow’s prefabricated steel bridges feature a modular design that allows for the easy customisation of each structure to meet specific site requirements. They can be erected in days or weeks by a local workforce and minimal heavy equipment is required, while offering a service life of 75 years or more. Fabricated in the US from high-strength, high-quality steel, the components are hot-dip zinc galvanised to protect against corrosion.
 

Related Content

  • Deciding whether to buy new or used equipment
    May 20, 2015
    Customers can face the choice of buying used or new equipment – Dan Gilkes writes. The decision to buy either new or used equipment is almost as old as the construction plant market itself. However some of the reasons for choosing between the two might well be changing, to meet new demands from customers across the world and to cope with a changing supply base. Ever more stringent emissions legislation in Europe, the US and Japan, rapidly developing emerging markets that want the productivity of the latest
  • What lies beneath Down Under
    January 11, 2021
    The third and final construction stage on Sydney’s WestConnex project has begun, including the underground Rozelle Interchange – with a lot of help from Komatsu
  • Weigh in motion technology reduces road damage
    February 8, 2012
    Overweight vehicles cause enormous damage to road structures but they can be caught, even at high speed. Weigh-in-motion or WIM devices are designed to capture and record axle weights and gross vehicle weights as vehicles drive over a measurement site.
  • Two new rough terrain cranes and a new MLC165 lattice-boom crawler crane from Manitowoc
    January 6, 2017
    Manitowoc will unwrap two new Grove rough-terrain cranes at Bauma: the RT550E and RT770E, as well as a new lattice-boom crawler crane. The 45tonne capacity RT550E offers the highest and longest boom in its class at 39m and, with a chassis length of just under 12m, a width of 2.55m and an operating weight of 29tonnes, the new machine is a compact crane that can run well within most national European road regulations for heavy machinery says Manitowoc. The RT550E also features the manufacturer’s new crane con