Skip to main content

Zambian bridge replacement programme

A bridge replacement programme in Zambia is connecting communities.
By MJ Woof March 9, 2020 Read time: 2 mins
Training has been carried out by Acrow Bridge in Zambia for local personnel on the modular bridge nits - image © courtesy of Acrow Bridge

Zambia is benefiting from a programme to install bridges and connect rural communities. The country has bought over 130 modular steel bridges measuring from 12m in length to more than 100m-long from Acrow Bridge.

The bridges include single- and multi-span span structures of one- and two-lane widths. And Acrow Bridge is providing training to Zambian engineers, technicians and contractors in assembly, installation and maintenance of the bridges, which were recently delivered to Zambia’s Road Development Agency.

These bridges are being installed where such links are particularly critical and will contribute to the integration of remote rural communities into the broader domestic and regional economy.

Through its financed Comprehensive Bridge Development Program model, Acrow has worked on a number of large infrastructure development projects in Africa, including the supply of more than 150 bridges to the Government of Angola, 100 bridges to the Department of Feeder Roads in Ghana, and 44 bridges to the Government of Cameroon.
 
Acrow’s prefabricated steel bridges feature a modular design that allows for the easy customisation of each structure to meet specific site requirements. They can be erected in days or weeks by a local workforce and minimal heavy equipment is required, while offering a service life of 75 years or more. Fabricated in the US from high-strength, high-quality steel, the components are hot-dip zinc galvanised to protect against corrosion.
 

Related Content

  • Two new rough terrain cranes and a new MLC165 lattice-boom crawler crane from Manitowoc
    February 15, 2013
    Manitowoc will unwrap two new Grove rough-terrain cranes at Bauma: the RT550E and RT770E, as well as a new lattice-boom crawler crane. The 45tonne capacity RT550E offers the highest and longest boom in its class at 39m and, with a chassis length of just under 12m, a width of 2.55m and an operating weight of 29tonnes, the new machine is a compact crane that can run well within most national European road regulations for heavy machinery says Manitowoc. The RT550E also features the manufacturer’s new crane con
  • Strong interest for construction equipment show
    February 21, 2012
    Most of the major manufacturers of extraction and crushing equipment worldwide will be present at the upcoming Hillhead show, either directly or through local distributors. Set in a working quarry, the Hillhead exhibition has set a lead for the quarrying sector. An industry only show, the event is being held this year at the Hillhead Quarry, Buxton in the UK on 22-24 June.
  • Strong interest for construction equipment show
    May 2, 2012
    Most of the major manufacturers of extraction and crushing equipment worldwide will be present at the upcoming Hillhead show, either directly or through local distributors. Set in a working quarry, the Hillhead exhibition has set a lead for the quarrying sector. An industry only show, the event is being held this year at the Hillhead Quarry, Buxton in the UK on 22-24 June.
  • Copy of New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk