Skip to main content

Vietnam’s road development programme

Vietnam is pushing ahead with its road and highway development programme. One crucial project is for the construction of the Ho Chi Minh (HCM) Road project. When complete the route will connect Cao Bang with Ca Mau, with some US$903 million required to finish the work. Around 79% of the 2,744km HCM route is open already, with the road due for completion by 2020. The 98km stretch linking Cam Lo and La Son should be ready in 2019, although work has stopped for the moment on another 289km section of the route
August 17, 2018 Read time: 1 min

Vietnam is pushing ahead with its road and highway development programme. One crucial project is for the construction of the Ho Chi Minh (HCM) Road project. When complete the route will connect Cao Bang with Ca Mau, with some US$903 million required to finish the work. Around 79% of the 2,744km HCM route is open already, with the road due for completion by 2020. The 98km stretch linking Cam Lo and La Son should be ready in 2019, although work has stopped for the moment on another 289km section of the route due to a shortage of funds. A further three sections of the road still have to be built.

Related Content

  • Boring complete for Slovakian tunnel project
    November 30, 2022
    Tunnel boring is now complete for a major Slovakian tunnel project.
  • Mumbai’s new coastal transport link
    July 6, 2022
    Mumbai’s new coastal road presents an ambitious and challenging project that will help improve the lives of the city’s inhabitants - Mike Woof writes
  • Guatemala road development plan announced
    December 19, 2016
    Guatemala is pushing ahead with a plan to develop its road network. The expansion programme will see over US$225 million being spent on improving the country’s road connections during 2017. The work calls for the construction of 1,600km of roads, which will help improve access to many rural areas. Tolled highways will also be completed in Barberena and Chimaltenango. Funding will come partly from the general road authority, Direccion General de Caminos (DCG) and from the cooperation fund Fondo de Solidarida
  • Kenya highway projects starting
    March 11, 2019
    Construction work is starting on two important road projects in Kenya. These are for the Dongo Kundu Southern Bypass and for the Mau Highway. The Mau highway project is worth US$2 billion and forms part of the route that links Kenya’s key port at Mombasa through its capital Nairobi to the border with neighbouring Uganda. The 180km Nairobi-Nakuru-Mau section of the A104 route will feature two lanes in either direction. The deal is being handled under a package that includes design, financing, maintenance a