Skip to main content

VIDEO footage shows bridge replacement project in Rhode Island

A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. Rhode Island Department of Transportation (RIDOT) partnered with EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full constru
October 10, 2014 Read time: 2 mins
A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. 3536 Rhode Island Department of Transportation (RIDOT) partnered with 7653 EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full construction seasons. By accelerating the construction process, the bridge was replaced in less than one month, saving money while eliminating traffic congestion.

The project was complex as the Barton Corner Bridge carries four lanes of I-95 plus two auxiliary lanes at a busy interchange with Route 2 on the Warwick/West Warwick line. Using accelerated bridge construction, RIDOOT built two halves of the bridge on land adjacent to the overpass, and then moved them into place. This enabled the new bridge to be constructed much faster compared with conventional construction methods, which would have taken twice the time. This approach also allowed RIDOT to do the work with no impact to Interstate traffic prior to installation.

EarthCam captured the innovative project from multiple angles by installing seven HD cameras in key locations.

Learn more about RIDOT and the Barton Corner Bridge replacement:

Time-Lapse: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.dot.ri.gov/news/barton_corner/video.php Visit http://www.dot.ri.gov/news/barton_corner/video.php false http://www.dot.ri.gov/news/barton_corner/video.php false false%>

Facebook: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.facebook.com/RIDOTNews Visit Facebook page false https://www.facebook.com/RIDOTNews false false%>

Twitter: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal twitter.com/RIDOTNews Visit Twitter page false https://twitter.com/RIDOTNews false false%>

YouTube: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.youtube.com/user/RIDOTwebmaster Visit RIDOT Youtube Page false https://www.youtube.com/user/RIDOTwebmaster false false%>

For more information on companies in this article

Related Content

  • Manitowoc releases lighter hoist rope for mobile cranes
    March 11, 2014
    Manitowoc has released the first synthetic hoist rope designed specifically for mobile cranes. The hoist rope is Grove’s new RT770E with KZ 100. It is a result of a joint development between Samson, a synthetic rope manufacturer, and Manitowoc. The hoist rope is 80% lighter than wire rope and features torque neutral construction that eliminates load spin and cabling. The new hoist material also makes for easy handling, reeving and installation as it reduces kinking, bird caging and damage from other t
  • E&E Event 2018 Berlin: an asphalt industry fit for purpose
    April 3, 2018
    Exhibition space is now sold out for the E&E Event 2018 – Euroasphalt & Eurobitume - coming to Berlin, June 14-15. But early registration for a discount is still available, however the deadline is fast approaching – April 16. The finalised programme will soon be published for the E&E Event 2018 that will focus on the preparations needed by the asphalt industry to ensure it is fit for purpose in the future.
  • Tappen Zee Bridge box seat is the best in the house
    May 21, 2015
    Bridge construction has sometimes been called theatre, with many acts and players building up to a finale. There is no better place to watch good theatre than from a prestigious box seat. This is especially true for the new Tappen Zee Bridge that is taking shape across the Hudson River in the US state of New York. In this case the box seat is just that – a box that sits high atop the old bridge, and it is occupied by a pair of peregrine falcons and their three babies. The family can be seen on-line thanks
  • North Viaduct completed on UK’s Mersey Gateway bridge project
    April 19, 2017
    Concrete finishing work has started on the completed north approach viaduct of England’s new 2.13km Mersey Gateway project. Over the past three years, around 18,400m³of concrete was used to build the viaduct. When complete near the end of this year, around 60,000 vehicles are expected to use the toll bridge every day, or nearly 22 million vehicles annually.