Skip to main content

VIDEO footage shows bridge replacement project in Rhode Island

A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. Rhode Island Department of Transportation (RIDOT) partnered with EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full constru
October 10, 2014 Read time: 2 mins
A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. 3536 Rhode Island Department of Transportation (RIDOT) partnered with 7653 EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full construction seasons. By accelerating the construction process, the bridge was replaced in less than one month, saving money while eliminating traffic congestion.

The project was complex as the Barton Corner Bridge carries four lanes of I-95 plus two auxiliary lanes at a busy interchange with Route 2 on the Warwick/West Warwick line. Using accelerated bridge construction, RIDOOT built two halves of the bridge on land adjacent to the overpass, and then moved them into place. This enabled the new bridge to be constructed much faster compared with conventional construction methods, which would have taken twice the time. This approach also allowed RIDOT to do the work with no impact to Interstate traffic prior to installation.

EarthCam captured the innovative project from multiple angles by installing seven HD cameras in key locations.

Learn more about RIDOT and the Barton Corner Bridge replacement:

Time-Lapse: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.dot.ri.gov/news/barton_corner/video.php Visit http://www.dot.ri.gov/news/barton_corner/video.php false http://www.dot.ri.gov/news/barton_corner/video.php false false%>

Facebook: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.facebook.com/RIDOTNews Visit Facebook page false https://www.facebook.com/RIDOTNews false false%>

Twitter: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal twitter.com/RIDOTNews Visit Twitter page false https://twitter.com/RIDOTNews false false%>

YouTube: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.youtube.com/user/RIDOTwebmaster Visit RIDOT Youtube Page false https://www.youtube.com/user/RIDOTwebmaster false false%>

For more information on companies in this article

Related Content

  • US driving distances see continued increase
    September 6, 2017
    New data released by the US Department of Transportation’s (USDOT) Federal Highway Administration (FHWA) shows that US driving topped 2.53 trillion kilometres in the first six months of 2017. This continues a streak of steadily increasing vehicle distances travelled that began in 2011.
  • Bell launches high-manoeuvrability 4x4 ADT for narrow bench work
    April 15, 2013
    Bell has introduced a 4x4 version of its B30D articulated dump truck (ADT). The machine has the front chassis, cab and engine of the standard 6x6 but comes with a shortened rear chassis and a single axle. According to Neville Paynter, managing director of Bell UK, the machine’s short wheelbase reduces the turning circle by around 25%, making it ideal for use in underground mining and on narrow benches.
  • Innovative road construction demonstration planned
    June 20, 2017
    A demonstration of innovative, sustainable road construction technologies is planned in France. The ERA-NET Plus Infravation has selected the BioRePavation project as part of its European and American transport infrastructure innovation programme.
  • CEI enters concrete plant market
    January 6, 2017
    CEI Enterprises is now developing a full new line of concrete production plants. This takes the firm, part of Astec Industries, into a new business segment and CEI is working on the engineering required as well as planning its manufacturing and marketing operations for these units. The range will include nine new designs of concrete plants and will include both traditional batch plants and innovative new plant technologies.