Skip to main content

VIDEO footage shows bridge replacement project in Rhode Island

A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. Rhode Island Department of Transportation (RIDOT) partnered with EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full constru
October 10, 2014 Read time: 2 mins
A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. 3536 Rhode Island Department of Transportation (RIDOT) partnered with 7653 EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full construction seasons. By accelerating the construction process, the bridge was replaced in less than one month, saving money while eliminating traffic congestion.

The project was complex as the Barton Corner Bridge carries four lanes of I-95 plus two auxiliary lanes at a busy interchange with Route 2 on the Warwick/West Warwick line. Using accelerated bridge construction, RIDOOT built two halves of the bridge on land adjacent to the overpass, and then moved them into place. This enabled the new bridge to be constructed much faster compared with conventional construction methods, which would have taken twice the time. This approach also allowed RIDOT to do the work with no impact to Interstate traffic prior to installation.

EarthCam captured the innovative project from multiple angles by installing seven HD cameras in key locations.

Learn more about RIDOT and the Barton Corner Bridge replacement:

Time-Lapse: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.dot.ri.gov/news/barton_corner/video.php Visit http://www.dot.ri.gov/news/barton_corner/video.php false http://www.dot.ri.gov/news/barton_corner/video.php false false%>

Facebook: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.facebook.com/RIDOTNews Visit Facebook page false https://www.facebook.com/RIDOTNews false false%>

Twitter: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal twitter.com/RIDOTNews Visit Twitter page false https://twitter.com/RIDOTNews false false%>

YouTube: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.youtube.com/user/RIDOTwebmaster Visit RIDOT Youtube Page false https://www.youtube.com/user/RIDOTwebmaster false false%>

For more information on companies in this article

Related Content

  • CEI enters concrete plant market
    January 29, 2014
    CEI Enterprises is now developing a full new line of concrete production plants. This takes the firm, part of Astec Industries, into a new business segment and CEI is working on the engineering required as well as planning its manufacturing and marketing operations for these units. The range will include nine new designs of concrete plants and will include both traditional batch plants and innovative new plant technologies.
  • Hazemag’s secondary impact crusher HSI 1414
    February 13, 2013
    HAZEMAG says it has combined two successful impact crusher series into a single one and thus increase efficiency in the secondary crushing. The new HAZEMAG HSI 1414, with a completely revised design, follows the principle of the platform strategy, which means “one housing – several options.“ “The customer may opt between different impact aprons and rotor types. Hence HAZEMAG increases the crusher’s efficiency. Within the modularly designed platform the grinding path, for example, may simply and easily (even
  • Putzmeister adds five-section pump
    January 6, 2017
    Putzmeister has added a five-section 38m, 160m3/hr concrete pump, which can be used to place loads inside buildings some 3m higher than the four-section option. Built on a 26tonne chassis, the new 38.5 can reach heights of 31m while leaving the final boom section to pass inside the building. In common with the company’s other machines, the 38.5 now has outrigger sensing, which feeds into the control system and prevents the boom from extending/slewing if the outriggers are not fully deployed. The machine als
  • Putzmeister adds five-section pump
    April 19, 2013
    Putzmeister has added a five-section 38m, 160m3/hr concrete pump, which can be used to place loads inside buildings some 3m higher than the four-section option. Built on a 26tonne chassis, the new 38.5 can reach heights of 31m while leaving the final boom section to pass inside the building. In common with the company’s other machines, the 38.5 now has outrigger sensing, which feeds into the control system and prevents the boom from extending/slewing if the outriggers are not fully deployed. The machine als