Skip to main content

VIDEO captures unloved, unowned Reynolds Bridge reduced to rubble

There was a big bang in a small town in the US state of Pennsylvania this month when a fragmentation explosion brought down the 100-year-old Reynolds Road Bridge. It was the end to the unloved bridge near Factoryville, population around 1,500. Factoryville is notable for a lack of factories ever since the one and only plant, a wool-into-cloth factory, closed down several years after it opened in the 1800s. Local residents were not sorry to see the felling of the 40m long, reinforced concrete arch deck
May 18, 2015 Read time: 2 mins
There was a big bang in a small town in the US state of Pennsylvania this month when a fragmentation explosion brought down the 100-year-old Reynolds Road Bridge.

It was the end to the unloved bridge near Factoryville, population around 1,500. Factoryville is notable for a lack of factories ever since the one and only plant, a wool-into-cloth factory, closed down several years after it opened in the 1800s.

Local residents were not sorry to see the felling of the 40m long, reinforced concrete arch deck bridge over a Canadian Pacific Railway line. For three years the ugly bridge deep within the beautiful Endless Mountain region of north eastern Pennsylvania had been closed because it was crumbling, not just into disrepair, but literally disintegrating.

Metres and metres of rebar along the pedestrian way were laid bare where nature had eroded away concrete. Parts of the structure, named after one of the first settlers in the region, Captain Robert Reynolds, had fallen into the ravine below. Earlier this month the rest of the bridge very quickly followed, when implosion subcontractor CDI shrouded the bridge and ended 100 years of history, and some recent confusion.

The bridge fell into disrepair because it also fell into a legal crack – no person, agency, company or local authority would acknowledge ownership, leaving the bridge in limbo, according to local media. When the old railway company, whose rail lines ran underneath the structure, went bankrupt, the bridge reportedly was not sold off with other assets and this went unnoticed for years, until repairs became urgent in the past decade or so.

Demolition was paid for by the Canadian Pacific Railroad, who now owns the rail lines that were running underneath the demolished bridge, according to local TV station WNEP.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Click here Visit crumbling bridge demolished Page false http://wnep.com/2015/05/14/crumbling-bridge-demolished/ false false%> to see local media reports on the bridge’s condition just before demolition.

Related Content

  • Caterpillar loads up a golf course and takes it for a spin
    July 13, 2015
    Caterpillar’s recent advertising campaign lends new meaning to the term ‘driving range’. The construction equipment manufacturer loaded several heavy mining and dump trucks with soil and created a moving golf course, complete with greens and even a small waterfall. The company then had two golfers attempt to hit the “greens” as the trucks, including a 928 wheel load, drove around within driving distance of the professionals. Click here to see not just how well the golfers did underneath a clear blu
  • Norway mulls new routes across the vast Hardangervidda plateau
    November 2, 2015
    Norway is considering proposals for another route across over the vast Hardangervidda, one of Europe’s largest plateaux and most of which is a national park. The Norwegian Road Administration (Statens Vegvesen) said one proposal would incorporate a 6km tunnel at a cost more than €216 million, according to a report the Nationen newspaper.
  • Re-branding of Waitzinger pumps is just the first step to integration with new parent Liebherr
    January 6, 2017
    Having acquired concrete pump manufacturer Waitzinger in October 2012, Liebherr is presenting the four-pump range in the yellow Liebherr livery. This is the first step towards integrating Waitzinger into the huge Liebherr empire. The next steps will see the integration of the two sales organisations. “There will be some markets where Liebherr is strong and some where Waitzinger is strong,” said spokesperson Kristian Kueppers. “We have to look at these and build up the sales organisation where it is required
  • Re-branding of Waitzinger pumps is just the first step to integration with new parent Liebherr
    April 17, 2013
    Having acquired concrete pump manufacturer Waitzinger in October 2012, Liebherr is presenting the four-pump range in the yellow Liebherr livery. This is the first step towards integrating Waitzinger into the huge Liebherr empire. The next steps will see the integration of the two sales organisations. “There will be some markets where Liebherr is strong and some where Waitzinger is strong,” said spokesperson Kristian Kueppers. “We have to look at these and build up the sales organisation where it is required