Skip to main content

VIDEO: Balfour starts M3 bridge upgrade in UK following demolition

Balfour Beatty has started bridge work over the M3 motorway as part of a €205 million upgrade on highway connecting London to south coast ports. Balfour recently demolished the Woodlands Lane Bridge between junctions 2 and 3 near Windlesham on the M3 which runs from the capital to Southampton and Portsmouth. A new bridge is being constructed Balfour Beatty is working for the agency Highways England to reduce congestion this section of the M3 that handles more than 130,000 vehicle journeys every day.
November 23, 2016 Read time: 2 mins
1146 Balfour Beatty has started bridge work over the M3 motorway as part of a €205 million upgrade on highway connecting London to south coast ports.

Balfour recently demolished the Woodlands Lane Bridge between junctions 2 and 3 near Windlesham on the M3 which runs from the capital to Southampton and Portsmouth. A new bridge is being constructed

Balfour Beatty is working for the agency 8100 Highways England to reduce congestion this section of the M3 that handles more than 130,000 vehicle journeys every day. Once is it converted into a smart motorway and open in summer 2017, there will be an extra lane in both directions, increasing capacity by a third. Technology will be introduced to vary speed limits.

More than 250 engineers worked on the controlled demolition of Woodlands Lane Bridge which used a variety of methods to break up the structure and protect the carriageway beneath. This included installation of plywood protection, 150mm of timber mats and a further 600mm of crushed concrete.

Unfolding geotextile curtains contained dust and rubble as the bridge collapsed onto the protected area of the road below.

“The work went according to plan in spite of the poor weather conditions, safely, on time and the carriageway was reopened ahead of schedule,” said Stephen Tarr, managing director for major projects with Balfour Beatty.

For more information on companies in this article

Related Content

  • Variable message signs emerging from the shadows
    July 8, 2016
    Variable message signs are increasingly seen on the world’s motorways. World Highways looks at some of the latest developments UK manufacturer of temporary, solar powered variable message signs, Bartco UK, has unveiled what it says is the first temporary VMS designed for use within work zones. Bartco said that its HD Quattro was developed in response to feedback from customers requiring a product to affirm on-site speed limits for work zone vehicles. The unit is designed to show limited amounts of inform
  • Balfour Beatty demolishes M8 bridge to create junction
    August 8, 2013
    A huge array of construction machinery from leading international equipment manufacturers was deployed by Balfour Beatty recently to demolish a farm access bridge over the M8 motorway between junctions 4 and 5 to enable the completion of slip roads for the new Heartlands junction in West Lothian, Scotland. The Cowhill Bridge demolition was a major milestone for Ecosse Regeneration in the construction of Junction 4a. Ten excavators equipped with hydraulic breakers and munching attachments were used to remove
  • Bridge demolition with breakers
    May 5, 2021
    Hydraulic breakers from Italian firm Indeco have been used successfully to carry out important work on the Princes Freeway in Australia’s Victoria State.
  • Balfour Beatty wins road contract for Norfolk
    November 27, 2015
    Balfour Beatty has been awarded a €147.72 million (£104 million) road scheme by Norfolk County Council to complete works on the Norwich Northern Distributor Road (NNDR). The new road will serve Broadland, Norfolk, and improve access to North Norfolk and Norwich International Airport, with better links to Great Yarmouth and the south of the region. It will also bring relief on congested and unsuitable roads around the north and east of Norwich and improve capacity for future growth in jobs and housing.