Skip to main content

Viaduct implosion during works ahead of 2016 Olympics in Rio de Janeiro, Brazil

A just released video shows the dramatic implosion of a Rio de Janeiro viaduct as part of the Brazilian city’s preparatory works for the 2016 Olympic Games. Fábio Bruno Construções (FBC), the company behind the blast, shot the seven-minute film in November 2013 to illustrate what happens behind the scenes on this kind of project. The film illustrates how FBC expertly used explosives to simply drop the viaduct down a level in a controlled and pre-determined manner.
January 22, 2014 Read time: 1 min
A just released video shows the dramatic implosion of a Rio de Janeiro viaduct as part of the Brazilian city’s preparatory works for the 2016 1558 Olympic Games.

Fábio Bruno Construções (FBC), the company behind the blast, shot the seven-minute film in November 2013 to illustrate what happens behind the scenes on this kind of project.

The film illustrates how FBC expertly used explosives to simply drop the viaduct down a level in a controlled and pre-determined manner.

For more information on companies in this article

Related Content

  • Road safety stabilises in France in 2016
    June 28, 2017
    Road safety stabilises in France in 2016 However injuries from road crashes increased by 2.6% in 2016 to 72,645 when compared with the previous year.
  • Bertha restarts work on Seattle’s Alaskan Highway Viaduct project
    September 19, 2016
    Bertha, the tunnelling machine that is making its way under the US city of Seattle, has restarted work after nearly three weeks of scheduled maintenance downtime. The machine has been sitting more than 51m underground while crews replaced of 14 large cutting tools, according to the Washington State Department of transportation. Each tool weighs just under 275kg. Bertha - as the SR 99 tunnelling machine is called – is working on the Alaskan Way Viaduct Replacement Program. The Alaskan Way is an elevate
  • Safer with sharrows?
    September 30, 2020
    Do bike lanes make cyclists safer? Yes and no, says John Anderson, director of technology at Smart Design*
  • Pittsburgh bridge blasted
    October 7, 2013
    Explosive demolition has been used to remove an old highway bridge in Pennsylvania. Some 90kg of explosives were used to blast the pre-weakened steel structure of the 87 year-old Masontown Bridge. The redundant steel truss structure lay just 3m from the new bridge now carrying Route 21 over the Monongahela River and connecting Masontown with Monongahela Township. The location of the explosives and the pre-weakening work carried out however meant that the old structure, built in 1925 and upgraded in 1933, fe