Skip to main content

Pittsburgh bridge blasted

Explosive demolition has been used to remove an old highway bridge in Pennsylvania. Some 90kg of explosives were used to blast the pre-weakened steel structure of the 87 year-old Masontown Bridge. The redundant steel truss structure lay just 3m from the new bridge now carrying Route 21 over the Monongahela River and connecting Masontown with Monongahela Township. The location of the explosives and the pre-weakening work carried out however meant that the old structure, built in 1925 and upgraded in 1933, fe
October 7, 2013 Read time: 1 min
Explosive demolition has been used to remove an old highway bridge in Pennsylvania. Some 90kg of explosives were used to blast the pre-weakened steel structure of the 87 year-old Masontown Bridge. The redundant steel truss structure lay just 3m from the new bridge now carrying Route 21 over the Monongahela River and connecting Masontown with Monongahela Township. The location of the explosives and the pre-weakening work carried out however meant that the old structure, built in 1925 and upgraded in 1933, fell as planned and without any damage to the new bridge. Traffic was halted on Route 21 for the blast.

Related Content

  • VIDEO – Explosive blast apart redundant US bridge
    July 13, 2015
    The Donora-Webster Bridge over the Monongahela River in the US has been demolished using explosives. The ageing structure spanned the Monongahela River, connecting Washington and Westmoreland Counties in Pennsylvania. The bridge was built in 1908 and originally carried a rail link but in 1938 the tracks were removed and the structure was modified so that it could handle motor vehicle traffic instead. The Donora-Webster Bridge linked Route 837 on the west side of the Monongahela River with Route 906 on the east bank.
  • VIDEO: Successful explosive bridge demolition in Kentucky
    July 28, 2016
    A successful explosive bridge demolition job has been carried out in the US State of Kentucky. After a short delay, demolition specialists managed to remove the old Eggners Ferry Bridge successfully and without incident. The explosives broke up the four middle spans of the structure. The demolition job was not without its challenges, with concern over the presence of nesting ospreys on the structure. Demolition personnel had to keep a distance of 90m from the nesting area, which delayed preparations.
  • VIDEO: Explosive bridge demolition in Southern Italy
    February 15, 2016
    Italian contractor General Smontaggi has carried out a successful bridge demolition project in the south of the country. Explosives were used to remove the redundant Viadotto Caffaro Bridge carrying the A3 Autostrade. The 390m long structure had been found to be unsuitable for modern traffic requirements on the route, located in Calabria. The demolition project was not straightforward as the new bridge had already been constructed alongside the redundant structure. The extensive pre-weakening work for the old bridge included cutting into the deck to ensure it collapsed downwards.
  • Explosive demolition of US421 bridge over Ohio River
    September 23, 2013
    The fourth and final section of the Milton-Madison Bridge in the US has now been demolished. This aged 740m long structure was no longer able to cope with the traffic volumes along the route and has been demolished to make way for a new bridge. The bridge connects the US states of Indiana and Kentucky and has provided a key traffic route for the busy US421 over the Ohio River for many years. In a rather innovative piece of engineering, the new bridge has been constructed alongside the old structure and even