Skip to main content

US$410mn ADB loan to build second Vietnam Southern Highway

The Asian Development Bank (ADB) is to lend US$410 million to Vietnam for the construction of the Second Southern Highway that links Ho Chi Minh City and the Mekong Delta. The arterial highway will consist of two cable-stayed bridges measuring a total of 5km, and 26km of interconnecting roads and associated access. The interconnecting roads and two bridges are expected to reduce the three-and-a-half hour travel time between Long Xuyen and Ho Chi Minh City by an hour, while the 90-minute travel time between
August 14, 2013 Read time: 2 mins
The 943 Asian Development Bank (ADB) is to lend US$410 million to Vietnam for the construction of the Second Southern Highway that links Ho Chi Minh City and the Mekong 199 Delta. The arterial highway will consist of two cable-stayed bridges measuring a total of 5km, and 26km of interconnecting roads and associated access.

The interconnecting roads and two bridges are expected to reduce the three-and-a-half hour travel time between Long Xuyen and Ho Chi Minh City by an hour, while the 90-minute travel time between the Vam Cong ferry and the Cao Lanh ferry station is expected to be reduced by an hour.

Meanwhile, the 35.4km distance between Long Xuyen and Cao Lanh is expected to be cut to 29km. Construction of the two bridges is set to be launched in September 2013, and the highway and bridges, which will create 400,000 construction and manufacturing jobs, are projected to begin operation by late 2017.

Moreover, the work is projected to cost $860 million, with $260 million to be contributed by the 1290 Export-Import Bank of South Korea, $56 million from the 983 Vietnamese Government, and $143.4 million from the 3200 Australian Agency for International Development.

Related Content

  • Vietnam's key coastal highway
    February 7, 2012
    A major new highway project is starting shortly in Vietnam, which will improve the country's links with its neighbours. The US$440 million project is for a 220km highway in the Mekong Delta and will eventually form part of a 1,000km road connecting Vietnam with Cambodia and Thailand.
  • New bridges planned for Vietnam
    July 7, 2020
    New bridge projects are being planned for Vietnam.
  • Ho Chi Minh City pushes ahead with Thu Thiêm Bridge 4 project
    April 18, 2017
    Authorities in Vietnam’s southern Ho Chi Minh City are seeking prime ministerial approval for the nearly 2.2km-long Thu Thiêm Bridge 4 project. The six-lane bridge will cost more than US$230 million and be a build-transfer contract, according to a report in the Vietnam Investment Review. In September, Ho Chi Minh’s City’s People’s Committee said it is considering three investors for the work - Phát Đạt Corporation Real Estate Development, Investment Corporation 620 and 168 Construction Development Investmen
  • Last link in Vietnam’s North-South Expressway
    May 3, 2024
    The Chi Lang-Huu Nghi section is the last part of the 2,060km-long expressway that connects the southern Mekong Delta with the northern province of Lang Son, bordering China.