Skip to main content

US$410mn ADB loan to build second Vietnam Southern Highway

The Asian Development Bank (ADB) is to lend US$410 million to Vietnam for the construction of the Second Southern Highway that links Ho Chi Minh City and the Mekong Delta. The arterial highway will consist of two cable-stayed bridges measuring a total of 5km, and 26km of interconnecting roads and associated access. The interconnecting roads and two bridges are expected to reduce the three-and-a-half hour travel time between Long Xuyen and Ho Chi Minh City by an hour, while the 90-minute travel time between
August 14, 2013 Read time: 2 mins
The 943 Asian Development Bank (ADB) is to lend US$410 million to Vietnam for the construction of the Second Southern Highway that links Ho Chi Minh City and the Mekong 199 Delta. The arterial highway will consist of two cable-stayed bridges measuring a total of 5km, and 26km of interconnecting roads and associated access.

The interconnecting roads and two bridges are expected to reduce the three-and-a-half hour travel time between Long Xuyen and Ho Chi Minh City by an hour, while the 90-minute travel time between the Vam Cong ferry and the Cao Lanh ferry station is expected to be reduced by an hour.

Meanwhile, the 35.4km distance between Long Xuyen and Cao Lanh is expected to be cut to 29km. Construction of the two bridges is set to be launched in September 2013, and the highway and bridges, which will create 400,000 construction and manufacturing jobs, are projected to begin operation by late 2017.

Moreover, the work is projected to cost $860 million, with $260 million to be contributed by the 1290 Export-Import Bank of South Korea, $56 million from the 983 Vietnamese Government, and $143.4 million from the 3200 Australian Agency for International Development.

Related Content

  • Road tunnel for Hanoi's Hoàn Kiếm district
    July 7, 2022
    The project in the Vietnamese capital of Hanoi will have an investment of around US$4.3 million.
  • Vietnam: work on Phuoc Khanh cable stayed bridge to begin in August
    June 22, 2015
    Work on Vietnam’s 3.1km Phuoc Khanh cable stayed bridge will start in August after a deal was signed with the government in June. The contract was signed by the Vietnam Expressway Corporation and a consortium made up of Japanese contractor Sumitomo Mitsui and local partner Civil Engineering Construction Corporation (Cienco 4). The bridge is part of the 57km Ben Luc-Long Thanh Expressway project running through Long An Province, Ho Chi Minh City and Dong Nai province in southern Vietnam. The highway will a
  • Vietnam plans new roads for Hanoi city
    September 12, 2013
    Funding from South Korea will help finance work on a key road link for the Vietnamese city of Hanoi. The state-run Export-Import Bank (EXIM) of Korea will provide loans worth up to US$200 million to build the 17.85km road, which will connect Hanoi to a nearby industrial area. The four lane road will link the Nhon Trach industrial complex with Ho Chi Minh (HCM) City. The EximBank’s economic development cooperation fund is supplying the loans. In all the road project is likely to cost some $430 million, with
  • Vietnam’s North-South highway section given go-ahead
    September 21, 2018
    The Vietnamese Government has given the go-ahead for work on a key section of the country’s North-South highway project. This 7.5km stretch of the route will run between District 2's National Highway 22 and Hiep Phuoc Industrial Park. The work will cost US$365.4 million to carry out as it includes building the Phuoc Kieng, No 1, Rach Dia and Ba Chiem bridges. Located just to the south of Ho Chi Minh City, the Hiep Phuoc Industrial Park is in a delta area, which will require the construction of the bridge se