Skip to main content

US$410mn ADB loan to build second Vietnam Southern Highway

The Asian Development Bank (ADB) is to lend US$410 million to Vietnam for the construction of the Second Southern Highway that links Ho Chi Minh City and the Mekong Delta. The arterial highway will consist of two cable-stayed bridges measuring a total of 5km, and 26km of interconnecting roads and associated access. The interconnecting roads and two bridges are expected to reduce the three-and-a-half hour travel time between Long Xuyen and Ho Chi Minh City by an hour, while the 90-minute travel time between
August 14, 2013 Read time: 2 mins
The 943 Asian Development Bank (ADB) is to lend US$410 million to Vietnam for the construction of the Second Southern Highway that links Ho Chi Minh City and the Mekong 199 Delta. The arterial highway will consist of two cable-stayed bridges measuring a total of 5km, and 26km of interconnecting roads and associated access.

The interconnecting roads and two bridges are expected to reduce the three-and-a-half hour travel time between Long Xuyen and Ho Chi Minh City by an hour, while the 90-minute travel time between the Vam Cong ferry and the Cao Lanh ferry station is expected to be reduced by an hour.

Meanwhile, the 35.4km distance between Long Xuyen and Cao Lanh is expected to be cut to 29km. Construction of the two bridges is set to be launched in September 2013, and the highway and bridges, which will create 400,000 construction and manufacturing jobs, are projected to begin operation by late 2017.

Moreover, the work is projected to cost $860 million, with $260 million to be contributed by the 1290 Export-Import Bank of South Korea, $56 million from the 983 Vietnamese Government, and $143.4 million from the 3200 Australian Agency for International Development.

Related Content

  • Over US$2 billion for two Vietnam highway projects
    July 22, 2024
    More than US$2 billion will be invested for two Vietnam highway projects.
  • Vietnam’s expressway expansion programme
    February 23, 2022
    Vietnam’s expressway expansion programme is well underway.
  • Vietnam’s mountain highway improvement project
    December 17, 2018
    A 198km stretch of highway in northwestern Vietnam is to be upgraded. The route forms part of the Greater Mekong Subregion (GMS) Kunming-Hi Phòng Transport Corridor. A loan worth US$188 million from the Asian Development Bank (ADB) will help pay for the work. The highway runs through a mountainous region and is important to Vietnam as it provides a connection between Hà Ni and China's Yunnan province. The work will improve the existing road connections and boost connectivity for Vietnam’s northern provinces
  • Vietnam-Cambodia expressway link gets approval
    May 5, 2017
    Construction of a new expressway is intended to improve the connection between Cambodia’s capital Phnom Penh and Vietnam’s capital, Ho Chi Minh City. This is the product of discussions between the Vietnamese and Cambodian governments. The project is expected to cost US$650 million and the new link will feature three lanes in either direction and will run alongside the existing Highway 22 in Vietnam and Highway 1 in Cambodia. The new route will feature a maximum speed of 120km/h and will stretch for 65km in