Skip to main content

US$410mn ADB loan to build second Vietnam Southern Highway

The Asian Development Bank (ADB) is to lend US$410 million to Vietnam for the construction of the Second Southern Highway that links Ho Chi Minh City and the Mekong Delta. The arterial highway will consist of two cable-stayed bridges measuring a total of 5km, and 26km of interconnecting roads and associated access. The interconnecting roads and two bridges are expected to reduce the three-and-a-half hour travel time between Long Xuyen and Ho Chi Minh City by an hour, while the 90-minute travel time between
August 14, 2013 Read time: 2 mins
The 943 Asian Development Bank (ADB) is to lend US$410 million to Vietnam for the construction of the Second Southern Highway that links Ho Chi Minh City and the Mekong 199 Delta. The arterial highway will consist of two cable-stayed bridges measuring a total of 5km, and 26km of interconnecting roads and associated access.

The interconnecting roads and two bridges are expected to reduce the three-and-a-half hour travel time between Long Xuyen and Ho Chi Minh City by an hour, while the 90-minute travel time between the Vam Cong ferry and the Cao Lanh ferry station is expected to be reduced by an hour.

Meanwhile, the 35.4km distance between Long Xuyen and Cao Lanh is expected to be cut to 29km. Construction of the two bridges is set to be launched in September 2013, and the highway and bridges, which will create 400,000 construction and manufacturing jobs, are projected to begin operation by late 2017.

Moreover, the work is projected to cost $860 million, with $260 million to be contributed by the 1290 Export-Import Bank of South Korea, $56 million from the 983 Vietnamese Government, and $143.4 million from the 3200 Australian Agency for International Development.

Related Content

  • Vietnam costs the first section of the Bien Hoa-Vung Tau highway
    January 9, 2015
    The cost of the first section of Vietnam’s Bien Hoa-Vung Tau highway, a 47km stretch in the Southern Key Economic Zone, will be around US$355 million. Vietnam’s transport ministry said the total cost of the entire 70km motorway will come in at $1.03 billion. The government considers the zone to be the country’s engine of growth, accounting for 60% of Vietnam’s industrial production by value and 70% of export revenue. The zone consists of eight localities - Ho Chi Minh City (formerly called Saigon), Bi
  • Vietnam’s new beltway project
    October 12, 2018
    Work is progressing in Vietnam’s Ho Chi Minh City for construction of the new Beltway No3. An additional US$128.6 million is being set aside from the city’s budget to speed up work on the highway. The new beltway will measure 90km long, will allow vehicle speeds of up to 100km/h, with from two to four lanes in either direction. The route is being built in four sections. One stretch connects the Trung Luong expressway and National Highway No 22, another links National Highway No 22 and Binh Chuan, one joins
  • Construction of Vietnam’s Da Nang-Quang Ngai expressway begins
    November 25, 2013
    Construction of Vietnam’s US$1.4 billion Da Nang-Quang Ngai expressway is now underway. The near 140km-long expressway will have four lanes and a speed limit of 120km/hour. It will link economic hubs like Dung Quat (Quang Ngai), Da Nang-Chu Lai (Quang Nam) and Nhon Hoi (Binh Dinh). The expressway will also have a monitoring centre, a maintenance centre and a service centre. The Vietnamese government, the World Bank and the Japan International Co-operation Agency have provided official development assistan
  • New elevated road proposed for Ho Chi Minh City
    December 10, 2021
    A new elevated road is proposed for Vietnam’s Ho Chi Minh City.