Skip to main content

Upgrade set to start of Budapest’s Széchenyi Chain Bridge

Budapest’s iconic Széchenyi Chain Bridge that was opened in 1849 is set for a €73 million upgrade starting this summer, according to Hungarian media. Work will include revamping of a nearby tunnel in the Hungarian capital with completion set for the end of 2019. The suspension Chain Bridge spans the River Danube between Buda and Pest and was designed by English engineer William Tierney Clark following an initiative by the Count István Széchenyi. It is a larger scale version of Clark's earlier Marlow B
April 4, 2017 Read time: 2 mins
RSSBudapest’s iconic Széchenyi Chain Bridge that was opened in 1849 is set for a €73 million upgrade starting this summer, according to Hungarian media.

Work will include revamping of a nearby tunnel in the Hungarian capital with completion set for the end of 2019.

The suspension Chain Bridge spans the River Danube between Buda and Pest and was designed by English engineer William Tierney Clark following an initiative by the Count István Széchenyi. It is a larger scale version of Clark's earlier Marlow Bridge, across the River Thames in Marlow, near London. Its 202m centre span was one of the longest in the world when bridge was opened.

It was designed in sections and shipped from the United Kingdom for assemble in Budapest. The two-lane deck is nearly 15m wide and the iron chains on which the road-deck hangs are supported by two 48m river piers in classicist style. The bridge was rebuilt in the late 1940s after being blown up by the retreating German army in early 1945.

Related Content

  • More challenges for Stonehenge A303 scheme
    August 1, 2023
    National Highways’ Road Investment Strategy for England’s strategic roads has committed to upgrading many the remaining single carriageway sections of the A303.
  • Belgrade to get a tunnel between Savska and Dunavska
    May 26, 2017
    A tunnel is to be built between the Belgrade city areas of Savska and Dunavska Padina at a cost between €100-130 million, according to the mayor. Project design was done Ces Cowi which was awarded a tender worth nearly €198,000 by the Directorate for Construction Land. The 9.6m-wide tunnel will be nearly 2km long and lay around 38m below ground. Work, however, is not expected to start until the end of 2018 and take around 30 months. Meanwhile, work on the 470m Zezeljev Bridge across the Danube River in Novi
  • Storstrøm Bridge JV asks for extension
    July 13, 2023
    The original estimated cost was around €280 million for the 4km cable-stay structure when the contract was awarded by the Danish Road Directorate (Vejdirektoratet).
  • Building a replacement bridge in record time
    March 13, 2023
    The construction of a new bridge in Pittsburgh, Pennsylvania to replace a collapsed structure has been carried out in record time