Skip to main content

Upgrade set to start of Budapest’s Széchenyi Chain Bridge

Budapest’s iconic Széchenyi Chain Bridge that was opened in 1849 is set for a €73 million upgrade starting this summer, according to Hungarian media. Work will include revamping of a nearby tunnel in the Hungarian capital with completion set for the end of 2019. The suspension Chain Bridge spans the River Danube between Buda and Pest and was designed by English engineer William Tierney Clark following an initiative by the Count István Széchenyi. It is a larger scale version of Clark's earlier Marlow B
April 4, 2017 Read time: 2 mins
RSSBudapest’s iconic Széchenyi Chain Bridge that was opened in 1849 is set for a €73 million upgrade starting this summer, according to Hungarian media.

Work will include revamping of a nearby tunnel in the Hungarian capital with completion set for the end of 2019.

The suspension Chain Bridge spans the River Danube between Buda and Pest and was designed by English engineer William Tierney Clark following an initiative by the Count István Széchenyi. It is a larger scale version of Clark's earlier Marlow Bridge, across the River Thames in Marlow, near London. Its 202m centre span was one of the longest in the world when bridge was opened.

It was designed in sections and shipped from the United Kingdom for assemble in Budapest. The two-lane deck is nearly 15m wide and the iron chains on which the road-deck hangs are supported by two 48m river piers in classicist style. The bridge was rebuilt in the late 1940s after being blown up by the retreating German army in early 1945.

Related Content

  • Major Russian bridge projects underway
    December 13, 2017
    A series of major bridge projects are underway in Russia, in the Krasnodar Region, Novosibirsk and the Surgut District. A new bridge being built in the Krasnodar Region is expected to be open to vehicle traffic at the end of 2018. Work on the bridge supports is being completed at present and work on the deck is now underway. The bridge will also carry rail traffic from the end of 2019. Meanwhile in Novosibirsk, construction is commencing on a new bridge spanning the Ob River. This will be the fourth bridge
  • Uruguay highway concession contract awarded
    June 8, 2017
    Spanish firm Copasa of Spain has won the package of works to build Uruguay’s Ruta 14 Centro-Oeste highway. The contract is a build and operate deal, while the concession is for a 20 year term.
  • Steel sealed on Stonecutters Bridge
    February 6, 2012
    The stone mastic asphalt surface being laid on the bridge deck. The Stonecutters Bridge in Hong Kong, the second longest spanning cable stayed bridge in the world, is a dual three-lane crossing of the Rambler Channel. It utilises 33,500tonnes of structural steel in the bridge deck; 32,000m3 of concrete in the towers and 65 steel deck units relying on 224 cables. Effectively protecting the megastructure's deck from the weather extremes (monsoon rains and extreme heat in the summer) and the high levels of tra
  • New German autobahn bridge under constriuction
    May 1, 2015
    Crane manufacturer Manitowoc has supplied six Potain cranes to German contractor Max Bögl. These machines are being used for constructing a new bridge carrying the A3 autobahn, close to Limburg. Working at over 70m high, the cranes tower over the Lahn Valley. The cranes for this project were supplied by Max Bögl’s subsidiary, Max Bögl Transport & Geräte. The three topless Potain MDT 222 cranes were selected for the work as they feature tip heights of up to 76.2m and can operate with a working radius of