Skip to main content

Tunnels for the N44/A44 at Wassenaar will improve traffic flow

Traffic flow should improve between The Hague and Amsterdam in the Netherlands if tunnels are built at Wassenaar where the N44 becomes the A44 motorway. The number of vehicles that will travel through Wassenaar is expected to increase to 57,000 per day by 2030. However, only one if five vehicles are destined for Wassenaar, which has a population of around 26,000, according to a report by the Dutch civil engineering consultancy Royal HaskoningHDV,
September 27, 2018 Read time: 1 min
Traffic flow should improve between The Hague and Amsterdam in the Netherlands if tunnels are built at Wassenaar where the N44 becomes the A44 motorway.


The number of vehicles that will travel through Wassenaar is expected to increase to 57,000 per day by 2030. However, only one if five vehicles are destined for Wassenaar, which has a population of around 26,000, according to a report by the Dutch civil engineering consultancy Royal HaskoningHDV,

The open tunnels would cost between €160-180 million as against around €700 million for a full tunnel for the N44/A44 underneath all of Wassenaar, a wealthy suburb of The Hague, which lies around 10km away.

Related Content

  • Warm asphalt is a hot topic
    June 12, 2012
    Lower temperature mixes – a key advance in bitumen technology - Kristina Smith reports Warm and cold mix asphalts were not on the original agenda for this year’s Eurasphalt & Eurobitume Congress, being held in Istanbul in June. But when the organisers took a look through the papers submitted for their sustainability-themed event, they realised that this is one of the industry’s hottest topics. “We hadn’t quite anticipated the high level of research in this area,” says E&E’s technical programme committee c
  • Smombies! Look out!
    February 12, 2021
    Our city streets are being invaded by smartphone zombies, but help is on the way
  • Lower Thames Crossing contractor shortlist
    September 27, 2021
    The contractor shortlist has been announced for part of the Lower Thames Crossing.
  • Progress on Serbia’s Zezeljev bridge replacement is slow
    August 30, 2017
    Construction of the Zezeljev rail and road bridge across the Danube River is facing further delays, according to the Serbian government. Work on the 470m-long new bridge was supposed to be finished by this month. But national elections and changes of government have hampered progress, Serbian media have reported. The original bridge was completed in 1961 as a single-track railway line and separate roadway between the cities of Novi Sad and Petrovaradin. NATO attacked the structure five times during its camp