Skip to main content

TRL assist Highways Agency with UK motorway hole investigation

TRL provided a rapid response when asked for help as part of the investigation of the recent appearance of a Dene Hole in the central reservation of the M2 in Kent, southeast England. Within a few hours of being asked for assistance, TRL was able to mobilise a team to be onsite to provide two coring rigs and staff to undertake investigations of the carriageway in one lane either side of the hole, between junctions 5 near Sittingbourne and 6, near Faversham, to establish its integrity. The carriageway is co
February 19, 2014 Read time: 2 mins
777 TRL provided a rapid response when asked for help as part of the investigation of the recent appearance of a Dene Hole in the central reservation of the M2 in Kent, southeast England.

Within a few hours of being asked for assistance, TRL was able to mobilise a team to be onsite to provide two coring rigs and staff to undertake investigations of the carriageway in one lane either side of the hole, between junctions 5 near Sittingbourne and 6, near Faversham, to establish its integrity. The carriageway is constructed of jointed reinforced concrete with a thick asphalt overlay.

Two TRL teams working round the clock cored approximately 38 holes to help determine the extent of the problem.

The hole has been filled with pea gravel and the motorway is open, with two lanes running in each direction around the hole. The M2 is expected to fully re-open tomorrow (Thursday) morning.

For more information on companies in this article

Related Content

  • Set the ALARM for repairs in England and Wales
    January 10, 2019
    More than 3,900km of roads in England and Wales will need essential maintenance within the next year, according to the annual ALARM survey* Cash-strapped local governments are reporting that the gap between the funds they received and the amount they needed for repairs and maintenance was almost €639 million. This equated to an average shortfall of €3.75 million for every authority. It would take 14 years to get local roads back into a reasonable steady state, but only if adequate funds and resources wer
  • Fire damage closes bridge over UK's M1 motorway
    February 22, 2012
    Following a fire at a scrapyard under the motorway (one of Britain’s busiest) in April, extensive investigation, assessment and structural reinforcement work has taken place non-stop.
  • Romania’s important bridge project
    October 5, 2022
    Romania’s important Braila Bridge project will deliver a key crossing spanning the Danube River
  • Variable message signs emerging from the shadows
    July 8, 2016
    Variable message signs are increasingly seen on the world’s motorways. World Highways looks at some of the latest developments UK manufacturer of temporary, solar powered variable message signs, Bartco UK, has unveiled what it says is the first temporary VMS designed for use within work zones. Bartco said that its HD Quattro was developed in response to feedback from customers requiring a product to affirm on-site speed limits for work zone vehicles. The unit is designed to show limited amounts of inform