Skip to main content

TRL assist Highways Agency with UK motorway hole investigation

TRL provided a rapid response when asked for help as part of the investigation of the recent appearance of a Dene Hole in the central reservation of the M2 in Kent, southeast England. Within a few hours of being asked for assistance, TRL was able to mobilise a team to be onsite to provide two coring rigs and staff to undertake investigations of the carriageway in one lane either side of the hole, between junctions 5 near Sittingbourne and 6, near Faversham, to establish its integrity. The carriageway is co
February 19, 2014 Read time: 2 mins
777 TRL provided a rapid response when asked for help as part of the investigation of the recent appearance of a Dene Hole in the central reservation of the M2 in Kent, southeast England.

Within a few hours of being asked for assistance, TRL was able to mobilise a team to be onsite to provide two coring rigs and staff to undertake investigations of the carriageway in one lane either side of the hole, between junctions 5 near Sittingbourne and 6, near Faversham, to establish its integrity. The carriageway is constructed of jointed reinforced concrete with a thick asphalt overlay.

Two TRL teams working round the clock cored approximately 38 holes to help determine the extent of the problem.

The hole has been filled with pea gravel and the motorway is open, with two lanes running in each direction around the hole. The M2 is expected to fully re-open tomorrow (Thursday) morning.

For more information on companies in this article

Related Content

  • Not gone in 60 seconds
    June 10, 2019
    Our Skidmarks page is highly rated by readers. Your input could help make this page even more entertaining. If you come across any amusing road-related stories or pictures email me at [email protected] NOT GONE IN 60 SECONDS A bungling young car thief in Norway found one vehicle too tempting, and also too difficult for his (lack of) skills. The man managed to break into a Volvo saloon but then discovered to his horror that not only was he unable to start it, he was also unable to get out of it. The car
  • Fast, safe and sustainable transport for Johannesburg
    February 14, 2012
    GTZ highlights a pioneering scheme illustrating the potential of Bus Rapid Transit systems as a viable approach to alleviate the traffic and social problems faced by large cities worldwide
  • Fast, safe and sustainable transport for Johannesburg
    April 12, 2012
    GTZ highlights a pioneering scheme illustrating the potential of Bus Rapid Transit systems as a viable approach to alleviate the traffic and social problems faced by large cities worldwide Most major cities worldwide have been characterised by the phenomenon of steadily growing urbanisation accompanied by exponentially increasing numbers of private motorised vehicles. This has led to congested roads and sprawling cities, with commuters having to travel long distances to and from work. Despite huge inves
  • Spaghetti Junction reaches 40 year landmark
    May 21, 2012
    The famous Spaghetti Junction in Birmingham, central England marks its 40th birthday this week. A firm divider of opinion among the millions of motorists that use it each year, its sprawling concrete arteries at junction six of the M6 connect the A38(M) Aston Expressway into central Birmingham. Officially opened on 24 May 1972, the Gravelly Hill Interchange – Spaghetti Junction’s official name - took four years to build and cost between £9m and £10m. It was subsequently dubbed Spaghetti Junction by newspap