Skip to main content

Three bridges to be replaced in Nuremburg

In the southern German city of Nuremburg plans are being made for work to replace three old concrete bridges. A feasibility study into the proposed work will now be carried out. The three pre-stressed concrete bridges will have to be demolished and replaced with new structures. In all, the work is expected to cost some €100 million.
July 22, 2014 Read time: 1 min

In the southern German city of Nuremburg plans are being made for work to replace three old concrete bridges. A feasibility study into the proposed work will now be carried out. The three pre-stressed concrete bridges will have to be demolished and replaced with new structures. In all, the work is expected to cost some €100 million.

Related Content

  • Cowi wins Massey Tunnel design
    July 22, 2022
    Cowi has won a contract as owner's engineer for an eight-lane replacement immersed tunnel under the Fraser River near the Pacific coast city of Vancouver. Cowi said it will draw on its experience designing the original four-lane George Massey Tunnel in 1959 and whose removal the engineering firm will later oversee.
  • Work starting on second Chesapeake Tunnel project
    September 20, 2017
    Work is now starting on a major tunnel project in the US state of Virginia. Construction of a second tunnel connection for the Chesapeake Bay is expected to cost US$756million. The original Chesapeake Bay Tunnel and Bridge crossing opened to traffic in April 1964 and measures just over 37km long. Construction of a second parallel bridge was commenced in 1995 and opened to traffic in 1999. However the central tunnel link was not widened at that time and now carries more traffic than it was designed for, whil
  • Pre-stressed bridge decks use modular formwork system
    July 9, 2012
    Imaginative formwork, often using modular components, is helping to shape some challenging bridges worldwide. Patrick Smith reports Traffic volumes in and around Prague have swollen massively in recent years, pushing the existing road network to the limits of its capacity. To permanently ease congestion in the Czech capital's centre, a multi-lane orbital motorway is under construction as a high capacity bypass for central Prague and to link up all the motorways and other major highways radiating from the ci
  • Venezuela bridge replacement project announced
    February 24, 2017
    Work to replace the Guanape Bridge in Venezuela is now commencing. The existing structure collapsed on the 24th January of this year, injuring eight people, but is too severely damaged to be rebuilt. The bridge was built in 2011 so its collapse has been the subject of some controversy. Building the new two lane structure will cost an estimated US$312 million and should be complete by the middle of 2017.